Filter By
Element 3 - Support to Member States
-
Start date: 09/01/2019The activity is now completed. To find a copy of the project abstract with the main conclusions and recommendations, click here. The MarRINav (Maritime Resilience and Integrity of Navigation) project proposes activities in the UK national interest to lay the foundations for the UK’s future CNI for maritime and wider sectors in respect of Positioning, Navigation and Timing (PNT) resilience and…
Subcontractors
-
Start date: 01/03/2019To find a presentation summarizing the now completed activity, click here, to find the project abstract, click here. The Advanced Radio Frequency Interference Detection, Alerting and Analysis System (ARFIDAAS) project is directed at providing a high capability low cost solution to the growing threat of disruption of GNSS signals used for critical infrastructure due to intentional and…
-
Start date: 01/03/2019Autonomous shipping is crucial in future transport of goods and people. Trondheimsfjorden Test Area for Autonomous Ships was established in 2016 as the world’s first test area for autonomous ships, to enable the transformation from traditional to autonomous shipping. This project will develop infrastructure and methods for testing and verification of technologies and concepts. This will ensure…
Subcontractors
-
Start date: 01/11/2019The project "GNSS vulnerability & mitigation in Czech Republic" was managed and conducted by the GNSS Centre of Excellence (GCE) together with its partners Huld and the Research Institute of Posts and Telecommunications (VUS). The high-level objective of the project was to support Czech and Slovak activities related to the GNSS vulnerability and mitigation with a focus on the national critical…
Prime contractor
Subcontractors
Name: Research Institute of Posts and Telecommunications
Country: Slovakia
Website: https://www.vus.sk/index_ang.php
-
Start date: 03/02/2020The Cybersecurity Test & Evaluation Facility (CyTEF) primary goal is to provide cybersecurity research, test and evaluation services which address the changing threat landscape to the Space and Air Transportation Systems in Belgium, and most particularly possible, state-of-the-art cyber-attacks on UAS command-and-control, payload data and navigation systems. CyTEF will be deployed and…
Prime contractor
Subcontractors
-
Start date: 15/07/2020Over the past years, concerns about the impact of GNSS vulnerabilities in PNT applications have grown exponentially. In the maritime and inland waterways navigation domain this subject is of utmost importance. The RIPTIDE project targets a first phase in the development of a resilient PNT solution dedicated to the particularities of the Black Sea and Danube Lower Basin region. The main…
Prime contractor
Subcontractors
Name: Romanian Maritime Hydrographic Directorate
Country: Romania
Website: https://www.dhmfn.ro/index_en.shtml
-
Start date: 17/08/2020Position, Navigation and Timing (PNT) information is widely used for a range of critical services. The main sources for PNT information are GNSS satellites. The RF signals provided by the GNSS satellites covers wide areas but are quite weak and vulnerable to unintentional or intentional interference. This has been experienced in Norway. In this project, the novel concept of utilizing the…
Subcontractors
-
Start date: 23/10/2020The GNSS Event Notification Service (GENS) project’s aim is to create an initial national demonstration capability for GNSS event notification that is robust, secure and aligned to the UK national interest. In addition, GENS is planned to act as a catalyst to create a national centre for GNSS service threat identification and response. In support of the objective, GENS is also to provide…
Prime contractor
Subcontractors
-
Start date: 01/03/2021Considering the increased use of satellite-based services, the impact of GNSS disruptions or performance degradation on the safety and efficiency of aircraft operations is very important. GNSS signals are vulnerable to interference, voluntary or not, and this type of threat endangers the smooth running of operations. Moreover, continuous monitoring of GNSS performances is necessary for ensuring…
Prime contractor
-
Start date: 01/03/2021This project is a direct follow-on of the original ARFIDAAS activity which builds on the successful execution of that project by leveraging the results to support the involvement of an additional nation, as well as the spectrum management authorities from both Norway and Finland. The project will address specific GNSS signal use challenges within Finland while also building a wider network of…
Subcontractors