Filter By
Element 2 - Competitiveness in PNT
-
Start date: 09/10/2024Duration: 27 MonthsODYSSEY (Orbits-as-a-Service for Satellite Signals of Opportunity) is funded through Element 2 of the ESA NAVISP programme and is being carried out by GMV-UK. It will develop a precise orbit determination centre for communications satellite constellations. This will be used to provide a new commercial service generating precise orbits for different satellite constellations whose signals can be…
-
Start date: 03/09/2024Duration: 24 MonthsThe GNSS-R Technology for Water Leaks Detection project aims to engineer an instrument, which can be installed in any vehicle, capable of pre-localizing water losses using the technique of scatterometry. This technique involves driving a vehicle over the water pipe, identifying the sections with different moisture content than the average measurements. In this way, operators can avoid the…
-
Start date: 01/09/2024Duration: 18 MonthsThis project aims to develop a novel white-box GNSS receiver with a unique capability: achieving faster-than-real-time operation. This innovation will significantly accelerate development and testing cycles. The project will leverage the high-throughput capabilities of an AMD/Xilinx Versal board to realize this functionality. Furthermore, the project will culminate in the creation of a…
Prime contractor
-
Start date: 01/08/2024Duration: 19 MonthsThe management of rail logistics heavily relies on digital tools, where transport management systems (TMS) are pivotal. Despite the widespread use of TMS in road and ocean freight, rail freight lags by two decades. Addressing this discrepancy, Rail-Flow introduces a Rail TMS that integrates diverse data sources, including the Global Navigation Satellite System (GNSS), and collaborates with kasasi…
Subcontractors
-
Start date: 18/07/2024Duration: 12 Months4D imaging automotive radars are high-resolution, long-range sensors that can scan in both the horizontal and vertical planes, while identifying the distance, direction and relative velocity of detected objects. They are an increasingly important tool in the fight to reduce road deaths. With higher resolution than earlier radar sensors, 4D radars can detect many different reflection points from…
-
Start date: 01/07/2024Duration: 14 MonthsIn the context of the intensified jamming and spoofing activities, mitigation measures need to be employed to protect civilian users from the negative effects of interference. In line with the efforts of providing better solutions for resistance to interference, the ECHO-NN project proposes the enhancement of classical interference detection and localization algorithms with artificial…
Prime contractor
Subcontractors
-
The new Dynamic Optical Ranging & Timing (DORT) system opens up new possibilities for time and frequency transmission, especially in the NewSpace range. Due to its compactness and robustness, the system can be easily implemented in a CubeSat. In this project, the application of a satellite time bridge will be considered in particular. This is an alternative to realise (inter-)continental clock…
Prime contractor
Subcontractors
-
Start date: 01/06/2024Duration: 18 MonthsMain goal of the FAIR project is the demonstration in a real environment of a prototype for the mitigation of scintillation and multipath effects on GNSS positioning. The prototype is enabled by a scintillation Forecasting Model, patented by SpacEarth Technology and by algorithms for multipath mitigation patented by GTER. The prototype includes: - an Elaborating Facility, performing the…
Subcontractors
-
Start date: 01/06/2024Duration: 26 MonthsThe specific objective of this NAVISP project is the development of an SDR processor devoted to Low Earth Orbit (LEO) PNT applications. The LEO PNT system intends to provide services of accurate real-time positioning to complement the Global Navigation Satellite Systems (GNSS). A satellite constellation of LEO-PNT offers better signal power, that results in higher positioning accuracy and…
Prime contractor
-
Start date: 27/05/2024Duration: 19 MonthsThis project outlines a strategic plan of activities to elevate the Technology Readiness Level (TRL) of Precise Positioning and timing receiver for LEO applications (NAVTIME-RX) from TRL 5 to TRL 7. The project is based on SEXTANS receiver heritage and aims to accelerate the development and maturation of the GNSS receiver technology, positioning it closer to commercial readiness through the…
Prime contractor
Subcontractors
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/