Filter By
Element 1 - Innovation in satellite Navigation
-
Start date: 06/02/2024Duration: 24 MonthsThe NUMEROSO activity aims to assess the benefits of integrating Signals of Opportunity (SOOPs) with GNSS signals for navigation purposes, considering both terrestrial (such as 5G mobile or WiFi) and space-based (such as those transmitted by LEO satellites, or non-terrestrial networks) SOOPs. Leveraging advanced machine learning (ML) techniques, NUMEROSO will make use of SOOPs to enhance…
Subcontractors
-
Start date: 31/01/2024Duration: 24 MonthsOptical atomic clocks offer the potential for a new era of timekeeping, with laboratory systems at the world’s leading NMIs already demonstrating 100x improvements in accuracy compared with the microwave fountain clocks that offer the best realisations of the SIsecond. Enhanced PNT systems with these next-generation clock technologies could facilitate GNSS constellations with significantly-…
Prime contractor
-
Start date: 01/01/2024Duration: 12 MonthsIn the LEO project the next generation of modulators integrated on a silicon nitride platform will be realized. We will use the technique of micro-transferprinting to integrate lithium niobate on top of silicon nitride waveguides. This back-end integration allows for being compatible with wafer scale processing in CMOS fabs. The modulators are targeting bandwidths beyond 100 Ghz
-
Start date: 31/12/2023Duration: 18 MonthsFirst time development of an on-board autonomous digital beamforming of multiple beams for small/compact new space payloads, with medium/large number of channels supported. The innovation also relies on the number of channels, dynamic beamforming, low power. The activity will review the digital beamforming requirements for GNSS-R and Radio Occultation payloads, define a digital processor…
Subcontractors
-
Start date: 05/12/2023Duration: 24 MonthsThe objective of ACTOR (AuthentiCation Techniques for Optical time-transfeR) is to design, develop, manufacture and validate an authentication method for high-accuracy time transfer techniques over optical fibre, without a major loss of accuracy. The system is composed of a master and a slave demonstrator unit, each including software (SW)/protocol allowing authentication and integrity protection…
Subcontractors
Name: PTB (Physikalisch-Technische Bundesanstalt)
Country: Germany
Website: https://www.ptb.de/cms/en.html
-
Start date: 30/11/2023Duration: 18 MonthsThe principal aim of this project is to explore the applicability of today optics and photonic technologies to GNSS receivers. It is not always straightforward to understand which part of an electronic system may be conveniently replaced by its “photonic” counterpart, with clear advantages in terms of performance, integration density, power consumption, weight, EM immunity and…
Subcontractors
Name: TeCIP Institute of Sant’Anna School of Advanced Studies
Country: Italy
Website: https://www.santannapisa.it/en
Name: Thales Alenia Space Italy
Country: Italy
Website: https://www.thalesgroup.com/en/global/activities/space
-
In the context of the renewed interest in lunar exploration, the need for preparing the future user instrument for the new positioning service on the Moon has become very important, in particular for supplementing the current navigation techniques based on inertial sensors and cameras. A significant R&D effort is ongoing towards the development of dedicated lunar infrastructures for enhanced Moon…
Subcontractors
-
Start date: 23/03/2023Duration: 15 MonthsThe main objective of (VALLE) is to develop an innovative Privacy Preserving PNT concept that explore the possibilities and capabilities of the Privacy Enhancing Technologies, validating their functionalities but also non-functional aspects such as resilience and robustness by a dedicated red team analysis. The main goal of this project can be summarized as follows: • To identify, define and…
Subcontractors
-
Start date: 21/12/2022Duration: 18 MonthsGNSS such as GPS are vulnerable, largely due to the tiny signal strength and the geometry of satellites in urban environments. Drone regulatory frameworks are progressing to where autonomous flight and operations Beyond Visual Line-Of-Sight (BVLOS) are a possibility, thus driving the need for reliable navigation services to complement or act as a back-up to existing ones (chiefly GNSS). Trusted…
Prime contractor
Subcontractors
-
Start date: 13/12/2022Duration: 12 MonthsMoon exploration is emerging as the next global strategic priority in space exploration. Several dozens of commercial and institutional missions to the Moon are planned for the coming decades, with a major contribution also expected from ESA (e.g. Orion service module, ESA participation in Gateway lunar station and contribution to multiple lunar robotic missions). In spite of the wide variety of…
Prime contractor
Subcontractors