-
Start date: 04/09/2025Duration: 12 MonthsESA's NAVISP-EL1-077 project aims to develop a prototype Position, Navigation, and Timing (PNT) system, focusing on secure positioning through GNSS and 5G encrypted signals. The initiative includes creating two emulators: a User Terminal Emulator (UTE) and a Service Provider Emulator (SPE). Qascom and the consortium have two main objectives: developing a testbed and a prototype User Terminal.…
Subcontractors
-
KENOTOM will undertake the identification of State-of-the-Art of PNT Usage in AD/ADAS, the final Synthesis & Recommendations for NAVISP as well as the project management of the project NAVISTAR.
Subcontractors
-
Start date: 16/07/2025Duration: 24 MonthsTo investigate new concepts for ultra-accurate formation flying systems and initiate the develop a proof-of-concept software simulator on selected critical technologies. Main Outputs: Survey of state of the art, study of the possible concepts, enabling technologies and associated trade-offs Concept simulator (SW) Roadmap for technology maturation up to in-orbit demonstration, for instance…
Prime contractor
Name: Thales Alenia Space Italy
Country: Italy
Website: https://www.thalesgroup.com/en/global/activities/space
Subcontractors
-
Start date: 11/09/2024Duration: 12 MonthsReliable Integer Ambiguity Resolution (IAR) of carrier-phase measurements is critical for Global Navigation Satellite Systems (GNSS) high accuracy positioning. State-of-the-art IAR strategies employ well-established processes (float estimation, decorrelation and searching) which, however, cannot deem efficient for real-time kinematic applications. Analytically, by virtue of weak models, biases…
Prime contractor
Subcontractors
-
Start date: 12/07/2024Duration: 18 MonthsThe main technical objective of the activity is the design of a prototype receiving antenna in Ka-Band for satellite navigation. To reach this objective, suitable antenna design solutions will be identified that may fit to small satellite platforms (eg nU Cubesats), by either being small in dimensions of deployable. The proposed design concepts must meet the requirements for navigation functions…
Prime contractor
Subcontractors
- ‹ prev
- 1
- next ›