Start date: 28/10/2020The DGAP Project aims to design, develop and demonstrate in real operational environment, an innovative set of services for the management and monitoring of construction sites in order to support the Site Construction Manager and his/her team in their daily and periodical activities fostering the transition from traditional construction management to digital process and taking advantage of GNSS…
Subcontractors
-
Start date: 23/11/2020To set up a Worksite Protection System prototype introducing individual protection to improve workers safety and cutting delay in train traffic movements due to the limitation of the process based on current ATWS: • Avoid the impact of human factor in safe decision; • Introduce complete automation real time localization of operators and machines; • Reduce the…
Subcontractors
-
Start date: 15/09/2020GSTA is a follow on of a previous project funded by ESA: the GALIST project (Galileo Smart Traceability, ESA Contract 4000118560/16/NL/LF/hh) which had the objective, exploiting GNSS technology, to certify the position of food production events in order to support the “made in” value added. In order to achieve the stated goal, GNSS positioning solution has to be resilient against spoofing…
Subcontractors
-
Start date: 19/10/2020GIASONE is a GNSS integrity monitoring infrastructure able to provide a set of services to the users in order to safeguard its operational status when using GNSS. This solution can be considered the enabling technology to open the way towards a more pervasive usage of GNSS in almost all sectors, even where, its use is still considered secondary or partially applicable for safety reasons, such as,…
Prime contractor
-
Start date: 23/11/2020GNSS simulations are an important toolset supporting system engineering trade-offs and decisions. They are used to display and monitor key system performance indicators as well as study system behaviour, both through synthetic scenarios and real data replay. Industry and ESA currently use different tools to simulate GNSS systems, however often constrained to undertake only one of two different…
Subcontractors
Name: Politecnico di Torino - Department of Electronics and Telecommunications
Country: Italy
Website: https://www.polito.it/
-
Start date: 15/03/2022Today any safety critical application needs to improve its position and navigation performance in terms of integrity and resilience to disturbs. MEDEA project target is the development of an “applique” antenna equipment suitable for commercial and professional GNSS receiver to be adopted by users providing additional integrity to PNT solution being able to detect and mitigate potential…
Prime contractor
Subcontractors
-
Start date: 24/08/2022AGIS4RAIL is a very innovative solution to obtain the train absolute position exploiting a multi-sensor platform based on GNSS. AGIS4RAIL operates within ERTMS/ETCS signalling system, aiming at providing an economic solution to increase the efficiency of the traffic management. One main issue of the current system is represented by the Start of Mission (SOM) along the track. Infact, once the…
Prime contractor
-
Start date: 08/09/2022GSAB – Grimaldi Satellite Assisted Berthing is a premiere and flagship project, awarded by ESA – NAVISP 2 program to an international consortium led by Grimaldi in partnership with Kongsberg (Norway) and Radiolabs targeting the assisted berthing operations with big vessels as the PCTC – Pure Car & Truck Carriers. GSAB, introducing latest innovations on satellite-based multi-sensor…
Prime contractor
Subcontractors
-
Start date: 11/11/2022SEMOR-3D aims to include modelling techniques to overcome the problem of lack of precision in hostile railway environment as can be met in mountains or valleys where the GNSS satellites can lose visibility. In Italy as in the main railway network of centre Europe the percentage rails that runs in mountain area is relevant, so, adopting 3D techniques will extend the use of SEMOR and enhance the…
-
Start date: 13/12/2022Moon exploration is emerging as the next global strategic priority in space exploration. Several dozens of commercial and institutional missions to the Moon are planned for the coming decades, with a major contribution also expected from ESA (e.g. Orion service module, ESA participation in Gateway lunar station and contribution to multiple lunar robotic missions). In spite of the wide variety of…
Prime contractor
Name: Thales Alenia Space Italia S.p.A.
Country: Italy
Website: https://www.thalesaleniaspace.com/en
Subcontractors