-
High-quality maintenance and repair of road infrastructure is a necessary condition for the development of a modern society. This project, which deals with the issue of 3D milling according to the principles of Industry 4.0 and the fulfilment of the challenges of the "green deal", faces the following challenges in particular: Minimizing or completely eliminating the preparatory part of the…
Prime contractor
-
The project has been started in order to satisfy the requirements from specific Czech customers. The aim of the project is to develop and penetrate the EU railway market with a modular and precise positioning and communication device called NavCom X utilising Galileo as a preferred GNSS. Supplementary a methodology for testing performance and resilience of the system and its PNT solutions based on…
Subcontractors
-
Start date: 16/01/2023Duration: 18 MonthsThere is an abundance of GNSS receivers deployed around the world providing measurements and PNT information, which are currently combined into networks for a variety of GNSS processing and monitoring applications. However, these receivers remain vulnerable and cannot be used to isolate all sources of error on all GNSS signals and constellations due to the processed nature of the receiver output,…
-
128 - Monitoring and Estimation of Drones’ passage for augmented Security in critical Areas (MEDuSA)
Start date: 09/12/2022Duration: 24 MonthsDue to the rapidly increasing number of leisure drones operated everywhere, different accidental and deliberate incidents happen and even are becoming severe when happened in a critical area, like, for example, airports, ports, events in city areas, etc… As it is possible to see from the table below, some examples of incidents in different domains have demonstrated the need for an effective…Subcontractors
-
Start date: 22/06/2022Duration: 18 MonthsThe main goal of this activity is to design, develop, implement, and validate a system capable of generating accurate and stable timing information with high level of integrity and availability. To achieve this objective, the system will combine the input timing information provided by several timing sources, each generally with different characteristics. The system shall be able to detect…
Subcontractors
-
The goal of the proposed project is to develop a modem for Two-Way Satellite Time and Frequency Transfer (TWSTFT), based on a fully digital implementation, challenging the current state-of-art performance, and finished to allow small series industrial production and operation requirements. The technique of TWSTFT is known for decades. The main usage nowadays is in the field of world-wide…
- ‹ prev
- 1
- next ›