Start date: 16/01/2023Duration: 18 MonthsThere is an abundance of GNSS receivers deployed around the world providing measurements and PNT information, which are currently combined into networks for a variety of GNSS processing and monitoring applications. However, these receivers remain vulnerable and cannot be used to isolate all sources of error on all GNSS signals and constellations due to the processed nature of the receiver output,…
-
128 - Monitoring and Estimation of Drones’ passage for augmented Security in critical Areas (MEDuSA)
Start date: 09/12/2022Duration: 24 MonthsDue to the rapidly increasing number of leisure drones operated everywhere, different accidental and deliberate incidents happen and even are becoming severe when happened in a critical area, like, for example, airports, ports, events in city areas, etc… As it is possible to see from the table below, some examples of incidents in different domains have demonstrated the need for an effective…Subcontractors
-
Start date: 22/06/2022Duration: 18 MonthsThe main goal of this activity is to design, develop, implement, and validate a system capable of generating accurate and stable timing information with high level of integrity and availability. To achieve this objective, the system will combine the input timing information provided by several timing sources, each generally with different characteristics. The system shall be able to detect…
Subcontractors
-
NavIN: Indoor Navigation System Study project shall be a Feasibility Study with the aim to analyze the potential of utilization of GNSS technologies (combination of GPS and Galileo) in synergy with network technologies and Building Information Modelling, therefore to assess the feasibility and potential of a solution that would allow navigation indoors using ordinary devices with GPS and Galileo…
Subcontractors
-
Start date: 16/12/2020Duration: 15 MonthsIt is long debated whether a relation exists between the tidal stress produced by the Moon and the Sun on the Earth crust and the occurrence of difference geologic events, in particular large earthquakes and volcanic eruptions. Clear evidence for this relation has been elusive for a long time. However, the analysis of more complete global earthquake catalogues has shown that a significant…
Subcontractors
Name: RIGCT – Research Institute of Geodesy, Topography and Cartography
Country: Czech Republic
Website: http://www.pecny.cz
-
GNSS simulations are an important toolset supporting system engineering trade-offs and decisions. They are used to display and monitor key system performance indicators as well as study system behaviour, both through synthetic scenarios and real data replay. Industry and ESA currently use different tools to simulate GNSS systems, however often constrained to undertake only one of two different…
Subcontractors
-
The goal of the proposed project is to develop a modem for Two-Way Satellite Time and Frequency Transfer (TWSTFT), based on a fully digital implementation, challenging the current state-of-art performance, and finished to allow small series industrial production and operation requirements. The technique of TWSTFT is known for decades. The main usage nowadays is in the field of world-wide…
-
Start date: 05/11/2018Duration: 18 MonthsThe objective of the activity is to study GNSS carrier phase integrity techniques for application in railway safety of life applications, and in particular, the evolution of the European Rail Traffic Management System (ERTMS) with virtual balise detection using GNSS. Carrier phase positioning can achieve a significantly better performance than code-based positioning; however, to date there are no…
Subcontractors
- ‹ prev