Germany
-
Start date: 05/12/2023Duration: 24 MonthsThe objective of ACTOR (AuthentiCation Techniques for Optical time-transfeR) is to design, develop, manufacture and validate an authentication method for high-accuracy time transfer techniques over optical fibre, without a major loss of accuracy. The system is composed of a master and a slave demonstrator unit, each including software (SW)/protocol allowing authentication and integrity protection…
Subcontractors
Name: PTB (Physikalisch-Technische Bundesanstalt)
Country: Germany
Website: https://www.ptb.de/cms/en.html
-
Start date: 23/03/2023Duration: 15 MonthsThe main objective of (VALLE) is to develop an innovative Privacy Preserving PNT concept that explore the possibilities and capabilities of the Privacy Enhancing Technologies, validating their functionalities but also non-functional aspects such as resilience and robustness by a dedicated red team analysis. The main goal of this project can be summarized as follows: • To identify, define and…
Subcontractors
-
Start date: 16/04/2021Duration: 18 MonthsThe Hybrid Overlay Positioning with 5G and GNSS (HOP-5G) project targets the demonstration of a 5G local overlay testbed for enhanced user positioning, in combination with GNSS and sensor technologies. Within this project, the HOP-5G consortium focuses on the exploitation of 5G innovative positioning enablers and their hybridisation with GNSS and sensors. This is based on the dedicated deployment…
Prime contractor
Subcontractors
Name: Ericsson AB (Ericsson Research)
Country: Sweden
Website: https://www.ericsson.com/en/about-us/company-facts/ericsson-worldwide/sweden