-
Start date: 14/11/2026Duration: 9 MonthsThe project aimed to qualify HAUT-S as a satellite subsystem for autonomous onboard Precise Orbit Determination (POD) and Time Synchronization (TS) in low Earth orbit. Integrated as a self contained navigation payload, HAUT-S processed dual-frequency GPS and Galileo pseudorange and carrier-phase observations together with Galileo High Accuracy Service corrections. Its navigation processor combined…
Subcontractors
Name: DLR - Institute of Communications and Navigation
Country: Germany
Website: https://www.dlr.de/kn/en/
-
Start date: 23/07/2026Duration: 18 MonthsThe objective of 5G-SCRAL "5G for Safety-Critical Railway Advanced Localization" project is to analyse if 5G / FRMCS based positioning could be an alternative and complementary source of PNT for safety-critical rail applications. For this purpose, positioning solutions using the public 5G networks are to be tested in the rail environment.
Prime contractor
Subcontractors
-
Global Navigation Satellite Systems like Galileo and GPS are the backbone for position and timing in many industries today. For development and verification of GNSS chipsets GNSS signal simulators are widely used. The currently existing Rohde & Schwarz GNSS simulators are well accepted by customers nonetheless with evolving requirements and upcoming technical improvements in the field of GNSS new…
Prime contractor
-
Start date: 23/04/2026Duration: 24 MonthsThe activity will design and develop a generic user equipment (UE) platform in the form of hardware and software to evaluate and trade off user-side processing solutions and algorithms for positioning with 5G/6G Non-Terrestrial Networks (NTN).
Prime contractor
Subcontractors
-
Overview This project aims to advance the field of positioning, navigation, and timing (PNT) by integrating Low Earth Orbit (LEO) satellite signals with existing Global Navigation Satellite System (GNSS) technologies. The primary focus is on improving positioning and navigation capabilities, particularly within the professional high-end GNSS market, such as precision agriculture.…
Subcontractors
-
Start date: 12/02/2026Duration: 18 MonthsThe aim of the project is to demonstrate selected time and frequency transfer (UTC) techniques based on fibre optic networks. The implementation of such techniques, complementary to GNSS, is crucial to ensure the proper functioning of both the Critical National Infrastructure (CNI) and the various sectors of the economy. The project involves demonstrating two alternative scenarios for…
Prime contractor
Subcontractors
Name: PTB (Physikalisch-Technische Bundesanstalt)
Country: Germany
Website: https://www.ptb.de/cms/en.html
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/
-
As GNSS threats such as jamming and spoofing increase, impacting critical missions and infrastructures, the demand for real-time GNSS service monitoring grows. CrowdShield GNSS meets this need by delivering real-time monitoring and alerts for GNSS degradations at global, regional, and local scales. The solution innovatively hybridizes data from existing GNSS receivers, and ADS-B streams,…
Subcontractors
-
Start date: 14/11/2025Duration: 19 MonthsThe openRECEIVER system shall enable highly specialized GNSS experts to sell their PNT Software-as-a-Service (PNT SaaS) to Domain Application Developers of various market segments. The technology used makes PNT services better accessible to none GNSS experts, improving the penetration capability of European PNT products on global markets. The openRECEIVER platform will serve as a centralized…
-
Start date: 29/10/2025Duration: 18 MonthsThe main objective of this ITT is the study, design, implementation and demonstration of technologies, techniques and solutions to handle the presence of GNSS local effects (multipath, NLOS, jamming, spoofing) within the context of an EGNOS supported multi-sensor localization unit for railway users. This project aims at filling this gap by considering the following specific objectives: 1.…
Prime contractor
Name: DLR - Institute of Communications and Navigation
Country: Germany
Website: https://www.dlr.de/kn/en/
Subcontractors
-
Start date: 20/10/2025Duration: 18 MonthsThe EL1-106 MAGIC aims to address the development of a TRL 6 antenna array navigation receiver prototype, enabling PNT solutions in the C-band frequency, using the coming LEO- PNT IoD C-band signals. The main objectives for this activity are: Develop a receiver with C-band signal processing capability (up to high signal-bandwidth) Extend the receiver processing to support ESA LEO-PNT…
Subcontractors
Name: IDS – Chair of Integrated Digital Systems and Circuit Design at RWTH Aachen University
Country: Germany
Website: https://www.ids.rwth-aachen.de/
Name: DLR - Institute of Communications and Navigation
Country: Germany
Website: https://www.dlr.de/kn/en/