Start date: 13/09/2024Duration: 18 MonthsThe EPIC aims to address to develop algorithms and a SW simulator for combined usage of GNSS, LEO-PNT and 5G terrestrial transmitters to achieve high precision PPP-IAR solutions even in urban environments. The drivers for this activity are: ▪ Usage of alternative-PNT (LEO-PNT, 5G) means, in case GNSS is partially or fully not available ▪ Usage of additional-PNT (LEO-PNT, 5G) means…
Subcontractors
-
Start date: 11/09/2024Duration: 12 MonthsReliable Integer Ambiguity Resolution (IAR) of carrier-phase measurements is critical for Global Navigation Satellite Systems (GNSS) high accuracy positioning. State-of-the-art IAR strategies employ well-established processes (float estimation, decorrelation and searching) which, however, cannot deem efficient for real-time kinematic applications. Analytically, by virtue of weak models, biases…
Prime contractor
Subcontractors
-
The management of rail logistics heavily relies on digital tools, where transport management systems (TMS) are pivotal. Despite the widespread use of TMS in road and ocean freight, rail freight lags by two decades. Addressing this discrepancy, Rail-Flow introduces a Rail TMS that integrates diverse data sources, including the Global Navigation Satellite System (GNSS), and collaborates with kasasi…
Subcontractors
-
The new Dynamic Optical Ranging & Timing (DORT) system opens up new possibilities for time and frequency transmission, especially in the NewSpace range. Due to its compactness and robustness, the system can be easily implemented in a CubeSat. In this project, the application of a satellite time bridge will be considered in particular. This is an alternative to realise (inter-)continental clock…
Prime contractor
Subcontractors
-
Start date: 31/03/2024Duration: 18 MonthsThe “Maritime Autonomous Navigation using Alternative Absolute positioning techniques” (MANAA) project will provide new ways of integrating millennia old celestial navigation techniques with state-of-the-art technology and thinking, whilst developing visual and non-visual spectrum optical techniques and sensors with the potential to observe celestial bodies independently of the lighting and…
Prime contractor
-
ARRIVAL-X is a groundbreaking real-time maritime situational awareness and decision support tool that aims to enhance the operational efficiency and global competitiveness of ports by accurately predicting ship arrival times at pilot stations, delays and bottlencks. Utilizing AI and space-based data from Galileo, GPS, SAT-AIS constellations, and Copernicus Marine Service, ARRIVAL-X addresses the…
Prime contractor
Name: StellarShip Labs UG (limited liability)
Country: Germany
Website: https://www.space-ship.world/
-
Start date: 05/12/2023Duration: 24 MonthsThe objective of ACTOR (AuthentiCation Techniques for Optical time-transfeR) is to design, develop, manufacture and validate an authentication method for high-accuracy time transfer techniques over optical fibre, without a major loss of accuracy. The system is composed of a master and a slave demonstrator unit, each including software (SW)/protocol allowing authentication and integrity protection…
Subcontractors
Name: PTB (Physikalisch-Technische Bundesanstalt)
Country: Germany
Website: https://www.ptb.de/cms/en.html
-
The Nav4FutureMobility project aims at taking advantage of the commercial opportunity arising from the new legal framework in Germany (Level-4 Law, enacted in 2022), where Level 4 automation can become viable (for the first time) within specific operational design domains (designated operating areas) if a remote supervising entity is monitoring the operation in real-time. This project focuses on…
Subcontractors
Name: Ostbayerische Technische Hochschule Regensburg
Country: Germany
Website: https://www.oth-regensburg.de/en/
-
Start date: 23/03/2023Duration: 15 MonthsThe main objective of (VALLE) is to develop an innovative Privacy Preserving PNT concept that explore the possibilities and capabilities of the Privacy Enhancing Technologies, validating their functionalities but also non-functional aspects such as resilience and robustness by a dedicated red team analysis. The main goal of this project can be summarized as follows: • To identify, define and…
Subcontractors
-
Start date: 15/02/2023Duration: 9 MonthsThe OpSTAR Phase 0 study is a first step in the development of an in-orbit Testbed for payloads enabling bi-directional Optical Links for time-transfer and ranging. The Testbed product comprises two identical satellites, each carrying a payload hosting the core technologies, as well as two ground stations, the ground processing facility and equipment. It will be designed to execute a number…
Subcontractors
Name: DLR - Institute of Communications and Navigation
Country: Germany
Website: https://www.dlr.de/kn/en/