• → European Space Agency
  • Delegations Sign In
Header
navisp Header
  • Home
  • The Programme
  • Opportunities
    • All
    • Closed
  • Projects
  • Actors involved
  • Events
  • More
    • About Nav
    • Documents and Presentations
    • News Archive
  • Element 1 - Innovation in satellite Navigation
    • Overview
    • Invitations To Tender
    • Submit New Ideas
  • Element 2 - Competitiveness in PNT
    • Overview
    • Permanent Open Call for Proposals
  • Element 3 - Support to Member States
    • Overview
    • Permanent Open Call for Proposals
  • Additional info
    • External Links
    • Documents
    • esa-p
    • esa-star
    • FAQ
  • Connect With Us
    • Contact ESA
    • National delegations
    • Subscribe to Newsletter

Element 1 - Innovation in satellite Navigation

  • Overview
  • Yearly Workplans
  • Invitations To Tender
  • Submit New Ideas

Element 2 - Competitiveness in PNT

  • Overview
  • Permanent Open Call for Proposals

Element 3 - Support to Member States

  • Overview
  • Permanent Open Call for Proposals

Additional info

  • External Links
  • Documents
  • esa-p
  • esa-star
  • FAQ

Connect With Us

  • Contact ESA
  • National delegations
  • Subscribe to Newsletter

Projects Events

  • Ongoing
  • Completed
  • ICING

    ICING

    Element 3 - Support to Member States
    Start date: 17/08/2020
    Duration: 36 Months
    Position, Navigation and Timing (PNT) information is widely used for a range of critical services. The main sources for PNT information are GNSS satellites. The RF signals provided by the GNSS satellites covers wide areas but are quite weak and vulnerable to unintentional or intentional interference. This has been experienced in Norway. The aim of this project is the testing of a novel concept…

    Prime contractor

    Space Norway AS

    Name: Space Norway AS

    Country: Norway

    Website: https://spacenorway.no/

    Subcontractors

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

  • In-orbit demonstration of PPP on-board Norsat-TD

    In-orbit demonstration of PPP on-board Norsat-TD

    Element 3 - Support to Member States
    Start date: 12/05/2020
    Duration: 30 Months
    The objective of the project is to perform an In-Orbit-Demonstration of Precise Point Positioning technology on-board Norsat-TD. Norsat-TD is a technology demonstration mission coordinated by the Norwegian Space Agency to demonstrate key space-based technologies relevant to Norwegian industry.

    Prime contractor

    StatSat AS

    Name: StatSat AS

    Country: Norway

    Website: https://www.statsat.no

    Subcontractors

    Fugro Norway AS

    Name: Fugro Norway AS

    Country: Norway

    Website: https://www.fugro.com/our-services/marine-asset-integrity/satellite-positioning

  • Artificial Intelligence/Machine Learning Sensor Fusion for Autonomous Vessel Navigation (ARTISAN)

    Artificial Intelligence/Machine Learning Sensor Fusion for Autonomous Vessel Navigation (ARTISAN)

    Element 1 - Innovation in satellite Navigation
    Start date: 08/01/2020
    Duration: 24 Months
    Maritime transport is currently facing new challenges such as significant increases in transport volumes, more stringent environmental requirements and a shortage of seafarers in the future. One of the many new concepts having the potential to overcome these challenges is autonomous ship navigation. In particular, the concept is expected to allow for more efficient and competitive ship operations…

    Prime contractor

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

    Subcontractors

    SINTEF Ocean AS

    Name: SINTEF Ocean AS

    Country: Norway

    Website: https://www.sintef.no/en/ocean/

    SINTEF Digital

    Name: SINTEF Digital

    Country: Norway

    Website: https://www.sintef.no/en/digital/

  • GBAS Development and Verification

    GBAS Development and Verification

    Element 2 - Competitiveness in PNT
    Start date: 04/06/2019
    Duration: 24 Months
    Indra Navia AS has been developing GBAS GAST D ground station technology since 2010. This ground station is currently at a prototype stadium, with a few test installations at various airports,  and has been successfully operating during long-term stability testing, functional testing and flight tests. In order to bring the product to market, a large effort is required in order to verify the…

    Prime contractor

    Indra Navia

    Name: Indra Navia

    Country: Norway

    Website: https://indranavia.com/

  • Trondheimsfjorden Test Area

    Trondheimsfjorden Test Area

    Element 3 - Support to Member States
    Start date: 01/03/2019
    Duration: 24 Months
    Autonomous shipping is crucial in future transport of goods and people. Trondheimsfjorden Test Area for Autonomous Ships was established in 2016 as the world’s first test area for autonomous ships, to enable the transformation from traditional to autonomous shipping. This project will develop infrastructure and methods for testing and verification of technologies and concepts. This will ensure…

    Prime contractor

    SINTEF

    Name: SINTEF

    Country: Norway

    Website: http://www.sintef.no

    Subcontractors

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

  • GNSS RECEIVER ANTENNA

    GNSS RECEIVER ANTENNA

    Element 2 - Competitiveness in PNT
    Start date: 09/05/2018
    Duration: 28 Months
    The proposed product consist in a GNSS receiver antenna with extremely high performance that would address the suppression of the multipath from ground reflection. It shall integrate the Indra Navia GBAS ground station for landing aircraft in zero visibility conditions.

    Prime contractor

    Indra Navia

    Name: Indra Navia

    Country: Norway

    Website: https://indranavia.com/

  • 004 - Multi-System Multi-Sensor Maritime PNT Test Platform

    004 - Multi-System Multi-Sensor Maritime PNT Test Platform

    Element 1 - Innovation in satellite Navigation
    Start date: 21/02/2018
    Duration: 24 Months
    Current IMO work on guidelines for shipborne PNT data processing will define a high level framework for the processing and combination of data of multiple systems and sensors in a maritime PNT receiver. The definition of IMO guidelines are expected to significantly progress in the course of 2017. Therefore, it is considered of paramount importance to complement this work with further studies on…

    Prime contractor

    GMV NSL

    Name: GMV NSL

    Country: United Kingdom

    Website: https://gmvnsl.com

    Subcontractors

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

  • ‹ prev
  • 1
  • next ›

Connect with us

RSS Feed
Subscribe to our newsletter here:

Navisp

  • About NAV
  • About NAVISP
  • Innovation in satellite Navigation
  • Competitiveness in PNT
  • Support for Institutional projects
  • Opportunities

Contact

  • National Delegations

Support

  • Documents
  • FAQ
  • Privacy Notice and Consent Form

ESA Portals for tendered

  • EMITS
  • esa-p
  • esa-star