• → European Space Agency
Header navisp
  • Home
  • What is NAVISP
  • Open Opportunities
  • Projects
  • Actors involved
  • Industry Days 2023
  • News
  • Events
  • Documents and Presentations
  • Element 1 - Innovation in satellite Navigation
    • Overview
    • Invitations To Tender
    • Submit New Ideas
    • Yearly Workplans
    • Activities
  • Element 2 - Competitiveness in PNT
    • Overview
    • Permanent Open Call for Proposals
    • Activities
  • Element 3 - Support to Member States
    • Overview
    • Permanent Open Call for Proposals
    • Activities
  • Additional info
    • External Links
    • esa-p
    • esa-star
    • FAQ
  • Connect With Us
    • Contact ESA
    • National delegations
    • Subscribe to Newsletter
  • Other ESA NAV Programmes

Projects Events

  • Ongoing
  • Completed
  • 151 - Miniaturized Power Effective SBAS C-Band LNA

    151 - Miniaturized Power Effective SBAS C-Band LNA

    Element 2 - Competitiveness in PNT
    Start date: 21/03/2023
    Duration: 16 Months
    The activity is a development of a space segment compact C-Band LNA for use in Geostationary and Non-Geostationary Orbits. Its primary target is SBAS applications, but the Product will be capable to cover the full C-Band. The key function of the unit is to receive a signal at Uplink C-Band to feed the signal into the C-to L-Band downconverter for L-Band signal processing. Typical input signals…

    Prime contractor

    Konsberg Space Electronics

    Name: Konsberg Space Electronics

    Country: Norway

    Website: https://www.kongsberg.com/space

  • 102 - Compact Versatile SBAS Onboard Down Converter

    102 - Compact Versatile SBAS Onboard Down Converter

    Element 2 - Competitiveness in PNT
    Start date: 06/10/2022
    Duration: 18 Months
    The activity is a development and qualification of a Compact Versatile SBAS down converter, for use in GEO and MEO Satellites distributing augmentation data for more accurate positioning. Satellite Based Augmentation Systems have regional systems like EGNOS in Europe, WAAS in the US, MSAS in Japan and so on. Such functions have been embarked on multiple satellites of the last decades, and will…

    Prime contractor

    Konsberg Space Electronics

    Name: Konsberg Space Electronics

    Country: Norway

    Website: https://www.kongsberg.com/space

  • 122 - GSAB - Grimaldi Satellite Assisted Berthing

    122 - GSAB - Grimaldi Satellite Assisted Berthing

    Element 2 - Competitiveness in PNT
    Start date: 08/09/2022
    Duration: 18 Months
    GSAB – Grimaldi Satellite Assisted Berthing is a premiere and flagship project, awarded by ESA – NAVISP 2 program to an international consortium led by Grimaldi in partnership with Kongsberg (Norway) and Radiolabs  targeting the assisted berthing operations with big vessels as the PCTC – Pure Car & Truck Carriers.  GSAB, introducing latest innovations on satellite-based multi-sensor…

    Prime contractor

    Grimaldi Euromed S.p.A.

    Name: Grimaldi Euromed S.p.A.

    Country: Italy

    Website: https://www.grimaldi.napoli.it/it/index.html

    Subcontractors

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

    Radiolabs Consortium

    Name: Radiolabs Consortium

    Country: Italy

    Website: https://www.radiolabs.it

    Kongsberg Maritime AS

    Name: Kongsberg Maritime AS

    Country: Norway

    Website: https://www.kongsberg.com/

  • 057 - Development of advanced VDES-R user technologies for alternative PNT

    057 - Development of advanced VDES-R user technologies for alternative PNT

    Element 1 - Innovation in satellite Navigation
    Start date: 01/09/2022
    Duration: 18 Months
    Global Navigation Satellite Systems (GNSS) have become the primary marine aid-to-navigation and source of Position, Navigation and Timing (PNT) information. Yet, all GNSS are vulnerable to natural interference, deliberate and accidental jamming and spoofing. Trials have demonstrated that degraded GNSS produce hazardously misleading information and erroneous vessel positions without an alarm being…

    Prime contractor

    Telespazio UK Ltd (TPZ UK)

    Name: Telespazio UK Ltd (TPZ UK)

    Country: United Kingdom

    Website: https://telespazio.co.uk

    Subcontractors

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

  • 100 - Category III GBAS with evolution towards DFMC

    100 - Category III GBAS with evolution towards DFMC

    Element 2 - Competitiveness in PNT
    Start date: 21/10/2021
    Duration: 24 Months
    The Indra Navia Ground Based Augmentation System (GBAS) is currently transmitting corrections and integrity data for GPS only as this has been standardized by ICAO. ICAO is currently considering to amend the ICAO standards to include Galileo. The forecasted GAST F standard will be using multiple GNSS constellations and multiple frequencies (DFMC). The purpose of this project is to secure the…

    Prime contractor

    Indra Navia

    Name: Indra Navia

    Country: Norway

    Website: https://www.indracompany.com/en/indra-norway

  • 010 - ICING

    010 - ICING

    Element 3 - Support to Member States
    Start date: 17/08/2020
    Duration: 36 Months
    Position, Navigation and Timing (PNT) information is widely used for a range of critical services. The main sources for PNT information are GNSS satellites. The RF signals provided by the GNSS satellites covers wide areas but are quite weak and vulnerable to unintentional or intentional interference. This has been experienced in Norway. The aim of this project is the testing of a novel concept…

    Prime contractor

    Space Norway AS

    Name: Space Norway AS

    Country: Norway

    Website: https://spacenorway.no/

    Subcontractors

    Kongsberg Seatex

    Name: Kongsberg Seatex

    Country: Norway

    Website: https://www.kongsberg.com/

  • 011 - In-orbit demonstration of PPP on-board Norsat-TD

    011 - In-orbit demonstration of PPP on-board Norsat-TD

    Element 3 - Support to Member States
    Start date: 12/05/2020
    Duration: 30 Months
    The objective of the project is to perform an In-Orbit-Demonstration of Precise Point Positioning technology on-board Norsat-TD. Norsat-TD is a technology demonstration mission coordinated by the Norwegian Space Agency to demonstrate key space-based technologies relevant to Norwegian industry.

    Prime contractor

    StatSat AS

    Name: StatSat AS

    Country: Norway

    Website: https://www.statsat.no

    Subcontractors

    Fugro Norway AS

    Name: Fugro Norway AS

    Country: Norway

    Website: https://www.fugro.com/our-services/marine-asset-integrity/satellite-positioning

  • ‹ prev
  • 1
  • next ›
Subscribe to our newsletter

Navisp

  • About NAV
  • About NAVISP
  • Innovation in PNT
  • Competitiveness in PNT
  • Support for Institutional projects
  • Opportunities

Contact

  • National Delegations

Support

  • Documents
  • FAQ
  • Privacy Notice and Consent Form

ESA Portals for tenderers

  • esa-star
  • esa-p
  • esa-star-registration-process