Start date: 21/03/2025Duration: 18 MonthsThe core objective of the project PEGASO (PErformance of GNSS Auth Schemes by IndicatOrs) is to develop and validate a standardized methodology for evaluating GNSS anti-spoofing mechanisms and receiver implementations. This involves the realization of an end-to-end testbed that contains real and SDR receivers and a versatile simulation engine capable of generating navigations signals in realistic…
Subcontractors
-
Start date: 30/11/2024Duration: 18 MonthsThe main objective of this activity is to investigate innovative navigation algorithms exploiting FGO, both for a standalone GNSS unit and in combination with other sensors (INS), and for different receiver grades (including high- and low-quality modules). The activity will benchmark both the potential accuracy improvement and the computational cost of the proposed algorithms (in view of realtime…
Subcontractors
-
Start date: 01/07/2024Duration: 14 MonthsIn the context of the intensified jamming and spoofing activities, mitigation measures need to be employed to protect civilian users from the negative effects of interference. In line with the efforts of providing better solutions for resistance to interference, the ECHO-NN project proposes the enhancement of classical interference detection and localization algorithms with artificial…
Prime contractor
Subcontractors
-
Start date: 30/06/2024Duration: 12 MonthsUnmanned Aerial systems (UAS) industry has undergone significant growth, propelled by advancements in miniaturization, cost-effectiveness and sensor fusion frameworks. However, this market is still lacking trustworthiness as enabler for safety-sensitive operations. To achieve scaled adoption, user acceptance, and compliance to regulatory and standardization ecosystem are key…
Prime contractor
Subcontractors
-
Start date: 31/05/2024Duration: 18 MonthsA Shield Nanosatellite is an innovative and challenging idea that requires the integration of a wide array of technologies. OLAF leverages our company’s background experience and that of our partners in the areas touching with the main objectives of the tender. The main purpose of the mission is to use a space system for passively protecting space assets from space debris (and possibly…
Prime contractor
Subcontractors
Name: UNSTPB FIA (FAE)
Country: Romania
Website: https://upb.ro/en/faculties/the-faculty-of-aerospace-engineering/
-
In the context of the renewed interest in lunar exploration, the need for preparing the future user instrument for the new positioning service on the Moon has become very important, in particular for supplementing the current navigation techniques based on inertial sensors and cameras. A significant R&D effort is ongoing towards the development of dedicated lunar infrastructures for enhanced Moon…
Subcontractors
-
Start date: 23/03/2023Duration: 15 MonthsThe main objective of (VALLE) is to develop an innovative Privacy Preserving PNT concept that explore the possibilities and capabilities of the Privacy Enhancing Technologies, validating their functionalities but also non-functional aspects such as resilience and robustness by a dedicated red team analysis. The main goal of this project can be summarized as follows: • To identify, define and…
Subcontractors
-
Start date: 12/02/2023Duration: 18 MonthsThe main aim of RIPTIDE_PHASE_2 follows the strategic view identified in the first RIPTIDE project and targets the continuation of the development of a resilient PNT solution dedicated to the particularities of the Black Sea and Danube Lower Basin region, to cover a national need of resilient PNT tailored to address a sensitive region of Romania and of the EU. It therefore aims at achieving the…
Prime contractor
Subcontractors
Name: Romanian Maritime Hydrographic Directorate
Country: Romania
Website: https://www.dhmfn.ro/index_en.shtml
-
Start date: 27/02/2020Duration: 15 MonthsGPS has been used in space for more than 20 years and currently it is consistently used in LEO orbit satellites in order to provide position, velocity and time information. Extension of its use to higher altitude missions has been the subject of multiple studies, GEO and GTO orbits currently exploit GNSS signals and the NASA Magnetospheric Multiscale (MMS) mission has recently demonstrated that…
Subcontractors
- ‹ prev