Filter By
Element 3 - Support to Member States
-
Start date: 18/02/2026Duration: 15 MonthsUPDATE phase 2 will develop an MVP of a UK National PNT Digital Twin. The digital twin will provide “quasi-realistic model” of PNT services services across the UK (including GNSS, ELORAN and the NTC), informed by service status data, that looks, operates and behaves comparably to actual PNT services throughout the UK. The outcome of the project will be an open and modular PNT DT architecture…
Subcontractors
-
Start date: 18/02/2026Duration: 15 MonthsUPDATE phase 2 will develop an MVP of a UK National PNT Digital Twin. The digital twin will provide “quasi-realistic model” of PNT services services across the UK (including GNSS, ELORAN and the NTC), informed by service status data, that looks, operates and behaves comparably to actual PNT services throughout the UK. The outcome of the project will be an open and modular PNT DT architecture…
Subcontractors
-
Start date: 24/11/2025Duration: 26 MonthsBLACKOUT represents the implementation of a Black Sea Test Range to test and evaluate different PNT solutions in GNSS signal degradation and denial. BLACKOUT will comprise a dedicated testing area with the necessary logistics to test different PNT technologies, including access to vessels or other platforms to deploy terminals for PNT testing. Nevertheless, ground truthing and GNSS RFI…
Prime contractor
Subcontractors
Name: Romanian Maritime Hydrographic Directorate
Country: Romania
Website: https://www.dhmfn.ro/index_en.shtml
-
Start date: 02/11/2025Duration: 24 MonthsThe primary tool used all over the world for precise time transfer (comparisons of atomic clocks and atomic time scales) are special timing GNSS receivers. Such receivers require precise calibration with sub-nanosecond accuracy. It is necessary to eliminate a systematic error related to the delay of the received signal through the antenna and receiver electronics. For different receivers, these…
Prime contractor
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/
Subcontractors
Name: Poznań Supercomputing and Networking Center (PSNC)
Country: Poland
Website: https://www.psnc.pl/
-
Start date: 03/08/2025Duration: 24 MonthsThe MAGMA (Magyar GNSS Monitoring Assessment) project is dedicated to designing a scalable national GNSS monitoring infrastructure. It focuses on four key technical areas: data collection, transport, processing, and dissemination. The project addresses the growing demand for reliable and secure GNSS usage by exploring infrastructure design options that align with Hungarian legal requirements…
Subcontractors
Name: Budapest University of Technology and Economics
Country: Hungary
Website: https://www.bme.hu/en
Name: Molaris IT Developing and Consulting Ltd
Country: Hungary
Website: https://molaris.hu/en/home/
-
Start date: 11/06/2025Duration: 12 MonthsThis project will conduct a detailed investigation into the feasibility for, and if feasible, propose a design for a non-governmental function - a PNT Innovation Institute (PNTII). Several industrial and academic entities, including the National PNT Office, have identified the need for such an institute at the outline level through workshops at the Satellite Applications Catapult and National…
Prime contractor
Subcontractors
-
Start date: 01/05/2025Duration: 15 MonthsTOUCAN will complement efforts to reestablish a UK Enhanced Long-Range Navigation (eLoran) system, which will serve as a terrestrial backup to satellite-based services. A critical goal is to ensure that this system operates independently of the more vulnerable Global Navigation Satellite Systems (GNSS). The project’s primary objective is to establish an accurate, independently verifiable…
Subcontractors
-
The primary goal of SecureUTM 2 Phase I is to establish the foundational elements required for SecureUTM 2’s implementation efforts: Conduct targeted risk assessments and gap analyses to refine the security certification framework, improving alignment with evolving critical UTM challenges. Investigate the feasibility of PNT data authentication solutions to address critical…
Subcontractors
-
Start date: 10/02/2025Duration: 18 MonthsBuilding upon the results of the OpSTAR Phase 0 study carried out under NAVISP-EL2-139 by OHB Systems AG, the OpSTAR In-Orbit Demonstrator (IoD) Phase A/B1 will consolidate the OpSTAR IoD mission scope. It will notably refine the mission objectives as well as perform the System Preliminary Design Review (Step 1) of the overall OpSTAR IOD, preparing the foundations of the IOD Phase B2/C/D/E to…
-
Start date: 10/11/2024Duration: 24 MonthsThe proposed project seeks to develop a GNSS interference testbed for autonomous mobility including a methodology for testing and certifying GNSS interference with focus on jamming and spoofing threats. The current project will encompass the development of GNSS interference test scenarios, test and set-ups, testing executions, analysis of test results. The outcome of the project will be a…
Prime contractor