Filter By
Element 3 - Support to Member States
-
Start date: 12/02/2023Duration: 18 MonthsThe main aim of RIPTIDE_PHASE_2 follows the strategic view identified in the first RIPTIDE project and targets the continuation of the development of a resilient PNT solution dedicated to the particularities of the Black Sea and Danube Lower Basin region, to cover a national need of resilient PNT tailored to address a sensitive region of Romania and of the EU. It therefore aims at achieving the…
Prime contractor
Subcontractors
Name: Romanian Maritime Hydrographic Directorate
Country: Romania
Website: https://www.dhmfn.ro/index_en.shtml
-
Start date: 05/10/2021Duration: 30 MonthsUK Critical National Infrastructure (CNI) is at significant risk from the loss of access to GNSS for PNT. LF systems such as eLoran can provide a highly robust complement to GNSS. An eLoran transmitter can serve applications hundreds of miles away but the accuracy of the time transfer depends on the radio propagation (at ground level) between the transmitter and the receiver. At levels of…
-
Connected and autonomous cars represent the largest user community of high-integrity, high-accuracy and multi-sensor positioning systems. The project aims to develop a European level accredited laboratory for certified performance assessment of Advanced Driver Assistance Systems (ADAS) and autonomous driving applications relying on multi-sensors high integrity/high accuracy PNT solutions…
Subcontractors
-
Start date: 12/05/2020Duration: 30 MonthsThe objective of the project is to perform an In-Orbit-Demonstration of Precise Point Positioning technology on-board Norsat-TD. Norsat-TD is a technology demonstration mission coordinated by the Norwegian Space Agency to demonstrate key space-based technologies relevant to Norwegian industry.
Subcontractors
Name: Fugro Norway AS
Country: Norway
Website: https://www.fugro.com/our-services/marine-asset-integrity/satellite-positioning