Filter By
Element 2 - Competitiveness in PNT
-
Start date: 15/12/2023Duration: 24 MonthsIn the last years there has been a growing interest in Low Earth Orbit (LEO) constellations to provide telecommunication and navigation PNT services, both from commercial and governmental entities. ESA’s LEO PNT constellation proposes an augmented-PNT service compared to the classical MEO or GEO satellites in current GNSS systems. In this context, GMV proposes the development of an Engineering…
-
Start date: 15/12/2023Duration: 24 MonthsThe scope of the project is the design of an IC integrated circuit (single die) that implements the front-end receiver section of GNSS multi-band signal receiver space-born platforms. The frontend receiver includes all the circuits from the antenna to the ADC output and provides the digitalised output to the GNSS units base-band processors or SW receivers. The target applications are all GNSS…
-
Start date: 01/12/2023Duration: 24 MonthsCurrently, most of the launchers rely on inertial navigation, which introduces fundamental limitations both at performance and economical levels. In this scenario, hybrid solutions making use of GNSS capabilities emerge as an interesting alternative. One of the most mature initiatives within Europe, promoted by ESA and AVIO, consists of the development of a hybrid navigation unit for the future…
Subcontractors
-
Start date: 30/11/2023Duration: 21 MonthsThe objective of this proposal is to conceive, design and validate a breadboard solution capable of detecting and localizing spoofing. This part is achieved by a monitoring node referred to as SILENT node, which is a disruptive solution that does not exist in current commercial solutions, and that has only been presented in academic papers. An additional SW tool will be developed in the frame of…
Subcontractors
-
Start date: 11/08/2023Duration: 36 MonthsGMV’s end-to-end Safe HA solution comprises a complete E2E chain of elements from GNSS sensor stations and SSR corrections to the end user on-board Positioning Engine. The scope of the ENGINE project is to design, develop, validate and incorporate into an already operational service a set of new features and evolutions. The final goal will be to improve the positioning solution performance,…
-
Start date: 11/06/2023Duration: 24 MonthsCoherent Clock project will build a resilient and secured GNSS time solution based on several GNSS receivers distributed at metro-wide distances and able to combine their timing information into one global solution to optimize the accuracy of the time source and to provide synchronization to the core and aggregation network. This ground-based time distribution system is based on the use of the…
Prime contractor
Name: Safran Electronics & Defense Spain S.L.U.
Country: Spain
Website: https://www.safran-group.com/
-
RelyMap Connect is analytical software that improves GNSS location calculation performance in complex urban environments. During this activity, Envisage Space Ltd, supported by Cranfield University, will further develop, validate, integrate and demonstrate our technology in multiple city areas of interest. Further, Envisage will be engaging with specific market sectors with the aim of validating…
Prime contractor
Subcontractors
-
Start date: 25/05/2023Duration: 30 MonthsThe Voliera (overall) project has been conceived to develop a stand-alone localization platform independent from the current on-board subsystem with the aim to minimize the wayside components linked to the localization. Voliera project foresees different phases by following an engineering development. In the phase 2 there are 2 main goals: -develop the tools needed to verify the properties…
Subcontractors
-
Start date: 12/05/2023Duration: 16 MonthsCHARLI project aims to offer a new localization service to make rescue workers safer during an intervention. Today, no commercialized solution meets the requirements of precise and reliable tracking of emrgency agents: agents still die due to a lack of positioning solution. CHARLI solution is based on a foot-mounted localization device and innovative alogorithms that allow the poition
Subcontractors
-
Start date: 25/03/2023Duration: 18 MonthsThe objective of the activity is to develop a manufactor a prototype of an intgerated multi band and multi constellation GNSS antenna for high precision on ground applications.