Filter By
Element 2 - Competitiveness in PNT
-
Start date: 01/09/2024Duration: 18 MonthsThis project aims to develop a novel white-box GNSS receiver with a unique capability: achieving faster-than-real-time operation. This innovation will significantly accelerate development and testing cycles. The project will leverage the high-throughput capabilities of an AMD/Xilinx Versal board to realize this functionality. Furthermore, the project will culminate in the creation of a…
Prime contractor
-
Start date: 01/08/2024Duration: 18 MonthsXona Space Systems UK, QinetiQ, and Xona Space Systems Canada are undertaking a collaborative project to develop hardware-in-the-loop testbeds of the PULSAR PNT service. These will help to develop user equipment and to showcase the improvements the service will provide to various use cases for Automotive and Critical National Infrastructure (CNI) through enhanced positioning performance and…
Prime contractor
Subcontractors
-
Start date: 01/08/2024Duration: 19 MonthsThe management of rail logistics heavily relies on digital tools, where transport management systems (TMS) are pivotal. Despite the widespread use of TMS in road and ocean freight, rail freight lags by two decades. Addressing this discrepancy, Rail-Flow introduces a Rail TMS that integrates diverse data sources, including the Global Navigation Satellite System (GNSS), and collaborates with kasasi…
Subcontractors
-
Start date: 16/07/2024Duration: 13 MonthsTechnology re-fresh of an existing 4-channel RDF receiver to add beamforming and null steering to mitigate the effects of increasing manmade background noise and interference. Remote access will be provided for firmware update and for remote monitoring, and for multi-receiver triangulation. The engineering needs to be designed to accommodate antenna compromises including high local interference…
Subcontractors
-
Start date: 15/07/2024Duration: 28 MonthsXairos UK Limited, Inmarsat, and Heriot-Watt University will advance the development of satellite-based Quantum Time Transfer (QTT). This project will advance the development of QTT, a new secure optical two-way time transfer technology capable of highly secure picosecond level precision between ground-based clocks and clocks onboard satellites. QTT utilises individual photon pairs entangled in…
Subcontractors
-
Start date: 01/07/2024Duration: 14 MonthsIn the context of the intensified jamming and spoofing activities, mitigation measures need to be employed to protect civilian users from the negative effects of interference. In line with the efforts of providing better solutions for resistance to interference, the ECHO-NN project proposes the enhancement of classical interference detection and localization algorithms with artificial…
Prime contractor
Subcontractors
-
The new Dynamic Optical Ranging & Timing (DORT) system opens up new possibilities for time and frequency transmission, especially in the NewSpace range. Due to its compactness and robustness, the system can be easily implemented in a CubeSat. In this project, the application of a satellite time bridge will be considered in particular. This is an alternative to realise (inter-)continental clock…
Prime contractor
Subcontractors
-
Start date: 01/06/2024Duration: 26 MonthsThe specific objective of this NAVISP project is the development of an SDR processor devoted to Low Earth Orbit (LEO) PNT applications. The LEO PNT system intends to provide services of accurate real-time positioning to complement the Global Navigation Satellite Systems (GNSS). A satellite constellation of LEO-PNT offers better signal power, that results in higher positioning accuracy and…
Prime contractor
-
Start date: 27/05/2024Duration: 19 MonthsThis project outlines a strategic plan of activities to elevate the Technology Readiness Level (TRL) of Precise Positioning and timing receiver for LEO applications (NAVTIME-RX) from TRL 5 to TRL 7. The project is based on SEXTANS receiver heritage and aims to accelerate the development and maturation of the GNSS receiver technology, positioning it closer to commercial readiness through the…
Prime contractor
Subcontractors
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/
-
The proposed project develops the concept of orbit and clock determination for a LEO PNT system that uses high-precision on-board GNSS receivers providing POD in real time, and a reduced infrastructure in the ground segment. It also analyses the user segment, characterising the performance of the LEO PNT in the precise PPP positioning, evaluating the improvements in availability and convergence…
Subcontractors