Currently train location is guaranteed by track circuits (short cut made by the axles of bogies), or still by counting of axles (counting in the input-output wheel number from the segment), more recently by beacons RFID. These trackside elements require the installation of cables (formerly cupper or newly optical fiber) all along the tracks. It is costly and thus might not be accurate and flexible…
-
Start date: 03/08/2026Duration: 24 MonthsThe proposed project aims to develop an odometry and localization system leveraging Sensrad’s imaging radar technology – Hugin D1. By exploiting the rich spatial and Doppler information inherent in Sensrad’s imaging radar, the system will provide highly accurate positioning with increased redundancy, particularly in challenging environments where GNSS signals are unreliable or unavailable. The…
-
Start date: 22/07/2026Duration: 18 MonthsGIASONE -2 he development of an enhanced GNSS monitoring infrastructure to provide GNSS users with the tools to safeguard its operational status, starting from the prototype developed in GIASONE project. The proposed solution would be an enabling system to open the way towards safer and more pervasive usage of GNSS also in those fields where, nowadays, it is not of primary interest, such as…
Subcontractors
-
Start date: 17/07/2026Duration: 12 MonthsUnder an ESA NAVISP co-funded project, a new fully digital TW modem interoperable with the legacy one was developed by Eltvor (CZ), two prototypes were manufactured, and a preliminary test campaign has confirmed the targeted performance. The objectives of the proposed Experimentation Plan are to extend the verification and validation of the newly developed fully digital modem, including long-term…
-
Start date: 15/07/2026Duration: 12 MonthsGlobal Navigation Satellite Systems like Galileo and GPS are the backbone for position and timing in many industries today. For development and verification of GNSS chipsets GNSS signal simulators are widely used. The currently existing Rohde & Schwarz GNSS simulators are well accepted by customers nonetheless with evolving requirements and upcoming technical improvements in the field of GNSS new…
Prime contractor
-
The Luna Systems OCULIZE project aims to improve micro-mobility safety through the development of a dedicated AI-enabled camera platform for cyclists, capable of providing real-time proximity alerts and generating high-precision urban safety maps. The solution will enable the creation of geo-referenced 3D digital safety twins of cycling infrastructure by combining on-street image capture, machine…
-
Start date: 08/06/2026Duration: 18 MonthsBuilding on the successful outcomes of the ESA Kick-Start activity "Be a verifiable photojournalist!", the Verifiable ISTAR features of drones project aims to significantly enhance the trustworthiness of aerial information gathering. The project focuses on the integration of Galileo OSNMA (Open Service Navigation Message Authentication) into professional UAV platforms to provide high-assurance,…
Prime contractor
-
Start date: 01/06/2026Duration: 12 MonthsThe activity develops and validates an AI-enhanced GNSS integrity monitoring layer for safety-critical positioning applications. The solution combines high-accuracy GNSS correction services, RTK positioning, protection-level estimation and machine-learning based anomaly detection to assess whether a position solution can be trusted in real time. By monitoring correction quality, receiver…
-
Start date: 26/05/2026Duration: 12 MonthsDeveloping a LEO-PNT system as a complement to GALILEO requires many different building blocks, two of them will be developed within this NAVISP program: Precise Point Positioning (PPP) capabilities, including a self-calibration concept for autonomous compensation of receiver frontend delays, aiming at significantly enhancing the time determination performance of Beyond Gravity’s commercial GNSS…
-
Start date: 26/05/2026Duration: 18 MonthsThe objective of the activity is to upgrade the MEOLUT-Next technical offering by migrating the analog RF module to a more cost-effective, higher-performing digital solution with improved prospects for future evolution.
Prime contractor