Filter By
Element 2 - Competitiveness in PNT
-
Start date: 15/05/2026Duration: 24 MonthsLocAI - AI Enhanced Hybrid Positioning aims to develop next-generation positioning technology. By comb(a)ining crowdsourcing, AI, sensor fusion, and terrestrial radio signals, the project will provide GNSS-level accuracy in environments where traditional GNSS fails. The system will be globally applicable, scalable, and reliable for diverse applications, enabling precise indoor and outdoor tracking…
-
Start date: 16/04/2026Duration: 8 MonthsHyperSat SAFIR-PNT is a project by Creotech Instruments aiming to develop a small constellation of LEO satellites for detecting and locating GNSS interference. In the first phase (this 9-month Feasibility Study), the focus is on adapting the HyperSat platform for the mission, defining preliminary requirements, budgets, and risk assessments in order to join LEO-PNT. The study will look into using…
-
Start date: 09/04/2026Duration: 14 MonthsLow-Earth-Orbit Positioning, Navigation and Timing (LEO PNT) has emerged as one of the most transformative developments in the space sector. As global dependence on precise navigation and timing intensifies, LEO‑based solutions are rapidly becoming a strategic complement, and in some cases a necessary alternative, to traditional Medium Earth Orbit (MEO) GNSS systems. For several years now, with…
-
Start date: 02/04/2026Duration: 18 MonthsThe project aims to develop an innovative web- and mobile solution that integrates GNSS based navigation and AI-powered agronomic analytics. The Smart Analytics Platform will provide farmers, agronomic advisors, specialised sampling companies and food processing companies with a single tool to plan, implement, and analyse soil, plant and yield sampling workflows. The Platform will ensure…
-
Start date: 24/03/2026Duration: 15 MonthsThe project, with short name LAPNT, seeks to develop a more cost-efficient Zyntai solution providing precise timing further out in the network, closer to customers and end sites. The low-cost access network solution will also be attractive to adjacent industries that also require resilient timing such as Power Grids, Finance, Defense, etc. The deliverables of the project will be both hardware and…
-
317 - Real-time detection and localization of GNSS spoofing and jamming using telecom infrastructure
Start date: 09/03/2026Duration: 12 MonthsThe project focuses on real‑time detection and localization of GNSS spoofing and jamming using dense telecom infrastructure as a distributed sensor network. By monitoring timing deviations, signal anomalies, and interference patterns across many closely spaced nodes, the system can rapidly identify and triangulate malicious sources. In lower airspace—where drones, air taxis, and critical services… -
Start date: 02/03/2026Duration: 48 MonthsOverview This project aims to advance the field of positioning, navigation, and timing (PNT) by integrating Low Earth Orbit (LEO) satellite signals with existing Global Navigation Satellite System (GNSS) technologies. The primary focus is on improving positioning and navigation capabilities, particularly within the professional high-end GNSS market, such as precision agriculture. Objectives:…
Subcontractors
-
Start date: 02/03/2026Duration: 12 Months4D imaging automotive radars are high-resolution, long-range sensors that can scan both horizontally and vertically, identifying the distance, direction, and relative velocity of detected objects. With higher resolution than earlier radar sensors, 4D radars can detect many different reflection points from the same object, which by mapping them out, begins to resemble an image. As they become more…
-
Start date: 02/03/2026Duration: 24 MonthsWe propose to develop a ground based, industrial and compact laser cooled cesium clock with unprecedented long-term frequency stability and accuracy (timing hold over goal = 100 ns over 1 year). This product will provide reliable and performing back up frequency and timing signals in case of very long PNT signal disruption (environment perturbations, jamming, spoofing ...) and guarantee…
Prime contractor
-
Start date: 02/03/2026Duration: 18 MonthsSPARTA is an innovative project that aims to develop a next-generation solution for resilient UAV navigation, addressing the critical challenges of GNSS vulnerability to spoofing, jamming and operation in GNSS-degraded or denied environments. The UAV market is rapidly expanding in sectors such as logistics, infrastructure inspection, precision agriculture, public safety and defence. As operations…
Subcontractors