The primary goal of SecureUTM 2 Phase I is to establish the foundational elements required for SecureUTM 2’s implementation efforts: Conduct targeted risk assessments and gap analyses to refine the security certification framework, improving alignment with evolving critical UTM challenges. Investigate the feasibility of PNT data authentication solutions to address critical…
Subcontractors
-
Start date: 11/04/2025Duration: 9 MonthsThe NAVISP Geodesy-Enabled Applications project builds on the advancements expected from the ESA Genesis mission, which enhances geodetic reference frame accuracy and interoperability. The project’s tasks include analysing trends, engaging stakeholders, and identifying key innovations to drive the adoption of high-accuracy positioning services. By improving Precise Orbit Determination (POD) and…
Subcontractors
-
Start date: 01/04/2025Duration: 12 MonthsOptical clocks are at the core of alternative positioning, navigation, and timing (alt-PNT) solutions that do not depend on Global Navigation Satellite System (GNSS). When fully realised, alt-PNT will increase the resilience of Critical National Infrastructures (such as the UK National Timing Centre) and provide many sectors of the economy with increased commercial returns. OPTiK aims to…
Prime contractor
-
Start date: 21/03/2025Duration: 18 MonthsThe core objective of the project PEGASO (PErformance of GNSS Auth Schemes by IndicatOrs) is to develop and validate a standardized methodology for evaluating GNSS anti-spoofing mechanisms and receiver implementations. This involves the realization of an end-to-end testbed that contains real and SDR receivers and a versatile simulation engine capable of generating navigations signals in realistic…
Subcontractors
-
Start date: 17/03/2025Duration: 30 MonthsThe project develops and implements a more effective, more reliable, robust, competitive, state-of-the-art quad-GNSS service solution for top-precision commercial geodynamics, as well as developing new, commercially viable service for small-scale automated solutions.
-
Start date: 03/03/2025Duration: 48 MonthsMaritime shipping has embraced GNSS to improve safety and efficiency, but the availability and reliability of such systems have in recent years declined. The Maritime Alternative PNT Solution (MAPS) activity aims to demonstrate an Alternative PNT (APNT) solution based on the maritime VHF Data Exchange System (VDES) and the maritime Medium Frequency R-Mode service. The ambition in phase 1 of…
Prime contractor
Subcontractors
Name: DLR - Institute of Communications and Navigation
Country: Germany
Website: https://www.dlr.de/kn/en/
-
Start date: 03/03/2025Duration: 20 MonthsIn this project EnSilica will design and test a multi-band PNT radio which is suitable for being integrated into a future single chip PNT product.
-
Start date: 10/02/2025Duration: 18 MonthsBuilding upon the results of the OpSTAR Phase 0 study carried out under NAVISP-EL2-139 by OHB Systems AG, the OpSTAR In-Orbit Demonstrator (IoD) Phase A/B1 will consolidate the OpSTAR IoD mission scope. It will notably refine the mission objectives as well as perform the System Preliminary Design Review (Step 1) of the overall OpSTAR IOD, preparing the foundations of the IOD Phase B2/C/D/E to…
-
Start date: 28/01/2025Duration: 24 MonthsCurrently, satellite navigation mainly relies on dedicated GNSS constellations in Medium Earth Orbit (MEO). With the increasing demand for resilient and ubiquitous Positioning, Navigation, and Timing (PNT), several initiatives are underway to diversify the orbits and frequencies for GNSS. However, the rise of mega-constellations in Low Earth Orbit (LEO) for global telecommunication…
Prime contractor
Subcontractors
Name: Helios Technology
Country: United Kingdom
Website: https://www.egis-group.com/projects?sector=Aviation
-
Start date: 19/01/2025Duration: 24 MonthsThe objective of this project is to develop a fully independent, commercially viable SBAS ground reference station receiver prototype, demonstrated in an operational environment (TRL7). The receiver is designed to deliver accurate reference code and phase measurements, as well as Signal Quality Monitoring (SQM) information, to support SBAS corrections and safety processors.