Start date: 02/04/2024Duration: 12 MonthsThe objective of this activity is to develop a toolkit to support engineering activities for LEO PNT systems. The goal is to accelerate the design, development and planning of such systems, not only from a signal simulation capability based on COTS, but also making available fast-prototyping tools to check for receiver performance, focusing on signal processing aspects.
-
Start date: 02/04/2024Duration: 18 MonthsThe objective of this activity is to design a prototype deployable satellite navigation antenna in Ka band. A review into possible use cases for such an antenna on a small sat platform, to be used for navigation functions in combination with mega constellations shall be performed. A trade-off between different design solutions shall be performed, such as deployable helical or reflectors, and the…
Subcontractors
Name: Finnish Meteorological Institute (FMI)
Country: Finland
Website: https://www.ilmatieteenlaitos.fi/
-
Start date: 31/03/2024Duration: 18 MonthsThe “Maritime Autonomous Navigation using Alternative Absolute positioning techniques” (MANAA) project will provide new ways of integrating millennia old celestial navigation techniques with state-of-the-art technology and thinking, whilst developing visual and non-visual spectrum optical techniques and sensors with the potential to observe celestial bodies independently of the lighting and…
Prime contractor
-
Start date: 14/03/2024Duration: 11 MonthsARRIVAL-X is a groundbreaking real-time maritime situational awareness and decision support tool that aims to enhance the operational efficiency and global competitiveness of ports by accurately predicting ship arrival times at pilot stations, delays and bottlencks. Utilizing AI and space-based data from Galileo, GPS, SAT-AIS constellations, and Copernicus Marine Service, ARRIVAL-X addresses the…
Prime contractor
Name: StellarShip Labs UG (limited liability)
Country: Germany
Website: https://www.space-ship.world/
-
Start date: 13/03/2024Duration: 12 MonthsThe objective of the project is to focus on and implement existing time transfer data protocols (NTP, NTS...) and the feasibility of their integration in existing constellations. The scope is to study the overlay of data time transfer protocols (“Data TT”) onto satellite communication protocols. However, the perspective to study 5G NTN frames (“5G TT”) is not left out. The proposed…
Prime contractor
Subcontractors
-
Start date: 13/03/2024Duration: 24 MonthsThe goal of this proposal is to develop a novel product named SeCure AutheNtication Server (SCANS) that would provide the CAS encrypted snippets for the corresponding period and encryption/decryption functions in a centralized secure server. This approach would permit to simplify the CAS user terminals thus facilitating the adoption of the CAS service. Main functionalities will be: Galileo…
-
Start date: 08/03/2024Duration: 24 MonthsSENTINEL is an innovative project that aims to develop a comprehensive solution for monitoring the use of earth moving machines and addressing the crucial challenges of theft prevention and ensuring correct machine usage. The earthmoving machines market, a significant sector in the construction and mining industry, has witnessed a growing trend towards equipment rental and leasing, both in Europe…
Subcontractors
-
Start date: 08/03/2024Duration: 6 MonthsIn recent years, IoT applications have grown by leaps and bounds, however, due to its typically small physical size, only a small battery can fit inside a compact enclosure. This means energy usually comes at a high premium. Traditional GNSS chipsets consume too much energy, many IoT applications must either give up offering geolocation functions or suffer from short battery life. For IoT…
Prime contractor
-
Start date: 06/03/2024Duration: 12 MonthsThe I-MASTER project aims to design and develop on a fresh water volcanic lake a National Test Range to test and validate by using self-propelled unmanned large sized surface ship models devices, subsystems, apparatuses, and procedures (data fusion, AI, rules and regulations) for MASS operations.
Prime contractor
Name: CNR-INM (Italian National Research Council - Institute for Marine Engineering)
Country: Italy
Website: http://www.inm.cnr.it/
Subcontractors
-
Start date: 23/02/2024Duration: 24 MonthsThe scope of the work is to implement a multichannel disciplined oscillator which will optimally combine a set of independent information (GNSS, ADS-B, PTP/NTP) in order to provide Time and Frequency with the highest level of protection against GNSS attacks. In fact, the proposed system will implement a set of countermeasures able to detect and to resist to spoofing, meaconing and even jamming…
Subcontractors