Filter By
-
Start date: 01/09/2022Date of Completion: 28/02/2024Global Navigation Satellite Systems (GNSS) have become the primary marine aid-to-navigation and source of Position, Navigation and Timing (PNT) information. Yet, all GNSS are vulnerable to natural interference, deliberate and accidental jamming and spoofing. Trials have demonstrated that degraded GNSS produce hazardously misleading information and erroneous vessel positions without an alarm being…
Prime contractor
Subcontractors
-
Start date: 19/05/2021Date of Completion: 21/05/2021Position uncertainty during autonomous manoeuvres such as orbit-raising/de-orbiting requires that the local knowledge during low thrust (i.e. with electric propulsion) is accurately determined. Current orbit-raising assumes semi-autonomous control assisted by GNSS, with a long time integral to measure increasing altitude and trajectory of the satellite. The use of a hybrid GNSS unit that…
Prime contractor
Subcontractors
-
Start date: 23/10/2018The COLOSSUS product is a cloud-based GNSS data processing platform for autonomous and continuous ingestion and processing of vast amounts of crowd-sourced RINEX data collected from continuously operating GNSS receiver (CORS) networks. It will take advantage of the availability of numerous public and private CORS networks that are routinely collecting RINEX data from multiple GNSS…
-
Start date: 15/01/2018To find a presentation summarizing the now completed activity, click here and to find a video, click here. The GNSS Interference Detection and Analysis System (GIDAS) enables a continuous 24/7 monitoring of the GNSS frequency bands within a defined region to automatically detect, classify and localize intentional interference by means of jamming and spoofing. GIDAS is a scalable and…
Subcontractors
Name: Institute Electronic Engineering (IEE) at the University of Applied Sciences FH JOANNEUM Graz
Country: Austria
Website: https://www.fh-joanneum.at/
-
Start date: 17/01/2018NEXTGEN GNSS is a multi-frequency/multi-constellation GNSS antenna aiming at providing centimetric accuracy and intended initially for use in the driverless car market. The antenna is based on proprietary dielectrically-loaded, multi-filar helix antenna technology and is optimised for use with the Galileo E1 and E5 AltBOC waveforms The proposed antenna will provide multi-frequency operation and,…
Prime contractor
-
Start date: 01/02/2019To address higher requirements from customers, Saphyrion has developed, through an internal project the SY1007A and SY1017A devices, which consist of an RF front-end and an AD/DA-converter ASIC for GNSS applications. The SY1007A is a radiation hardened L-band RF down-converter for GNSS receivers aimed at the professional and space markets. It includes all functional blocks needed to implement the…
-
Start date: 16/02/2018To find a presentation summarizing the now completed activity, click here. G-PASSION (Galileo Public Authenticated Server-based Snapshot positIONing) project is an innovative and competitive system in the Satellite Navigation and in the wider Positioning Navigation and Timing (PNT) domain. The object of this proposal is the design and development of a system for a GNSS server-based position…
Prime contractor
-
Start date: 15/01/2018GNSS is the only global, free, comprehensive technology providing absolute PNT data to users worldwide. Its limitations are known, including long life cycle and replenishment schedule, affecting their ability to adapt easily to short-term market needs and to some extent, resilience. Considering the above, alternative PNT methods and solutions have been developed or are being investigated,…
Prime contractor
Subcontractors
-
Start date: 23/06/2020MARGOT is a project implemented by a consortium led by RISE and including the Romanian Space Agency, GMV Romania and GEOECOMAR from Romania and Joanneum Research from Austria. MARGOT aims to assess the multipath and interference impact on PNT information in maritime environments for different operational scenarios. It includes the study and characterisation of multipath and interference in a…
Prime contractor
Subcontractors
-
Start date: 30/03/2022Development of highly flexible low cost and fully software configurable system employing the latest digital signal processing techniques to provide protection against interference of the GNSS signals. The system consists of a multi-element Controlled Radiation Pattern Antenna (CRPA) and a software defined Digital Antenna Control Unit (DACU). The activity is continuation of a two…