Start date: 02/03/2026Duration: 39 MonthsThe International Civil Aviation Organisation (ICAO) is currently working on the next iteration of Ground Based Augmentation System (GBAS) enabling CAT II/III approaches, GBAS Approach Service Type (GAST) E, supporting Dual Frequency Multi-Constellation (DFMC) GBAS. This concept will make GBAS more resilient to ionospheric activity and radio frequency interference (RFI), improve overall…
-
Start date: 18/02/2026Duration: 15 MonthsUPDATE phase 2 will develop an MVP of a UK National PNT Digital Twin. The digital twin will provide “quasi-realistic model” of PNT services services across the UK (including GNSS, ELORAN and the NTC), informed by service status data, that looks, operates and behaves comparably to actual PNT services throughout the UK. The outcome of the project will be an open and modular PNT DT architecture…
Subcontractors
-
Start date: 18/02/2026Duration: 27 MonthsThe GOACE (Ground Optical Atomic Clock for Evaluation) project aims to deliver an optical atomic clock for evaluation by the European Space Agency. Developed by Rolex Quantum and CSEM, the clock employs an optical transition in Rubidium to achieve outstanding long‐term frequency stability with competitive SWaP, and low‐maintenance. The clock will undergo a full year of continuous testing at…
Subcontractors
-
Start date: 18/02/2026Duration: 15 MonthsUPDATE phase 2 will develop an MVP of a UK National PNT Digital Twin. The digital twin will provide “quasi-realistic model” of PNT services services across the UK (including GNSS, ELORAN and the NTC), informed by service status data, that looks, operates and behaves comparably to actual PNT services throughout the UK. The outcome of the project will be an open and modular PNT DT architecture…
Subcontractors
-
Start date: 16/02/2026Duration: 26 MonthsThe proposed project named Multi-Frequency Alternative Position, Navigation and Timing (MF-APNT), will analyse, design, construct, demonstrate, measure and evaluate a new approach for distributing Position, Navigation and Timing (PNT) signals. The system concept is based on adding spread spectrum signals onto broadcasting and communication channels, hopping between frequency bands, and by doing so…
-
Start date: 16/02/2026Duration: 24 MonthsPNT satellite systems (i.e. GNSS) have become an integral part of contemporary society and economy. However, increasing reliance on continuous PNT availability raises concerns related to service disruptions, hardware failures, intentional jamming or spoofing, and operations in GNSS-denied environments. The Muometric Positioning System (MuPS) uses galactic cosmic rays to enable positioning where…
Prime contractor
Name: INRiM - Istituto Nazionale di Ricerca Metrologica
Country: Italy
Website: https://www.inrim.it/
Subcontractors
Name: HUN-REN Wigner Research Centre for Physics
Country: Hungary
Website: https://wigner.hu/en/about-us
-
Start date: 16/02/2026Duration: 25 MonthsA passive technique based on the dissemination of time via a Geostationary Earth Orbit (GEO) EGNOS satellite: - use of directional antennas, possible with GEO satellites - effective countermeasure to malicious jamming and spoofing - common GNSS receivers widely available to timing users - a network of time laboratories synchronized through fibre optic links to UTC(PL) - Correction the raw…
Subcontractors
Name: SPACE RESEARCH CENTER OF THE POLISH ACADEMY OF SCIENCES (CBK PAN)
Country: Poland
Website: http://www.cbk.waw.pl/
Name: Poznań Supercomputing and Networking Center (PSNC)
Country: Poland
Website: https://www.psnc.pl/
Name: Warsaw University of Technology - Faculty of Geodesy and Cartography
Country: Poland
Website: https://www.gik.pw.edu.pl/gik_en
-
Start date: 15/02/2026Duration: 22 MonthsThe main objective of this project is to design, develop, and validate a prototype ultra-large synthetic aperture array (ULSA) GNSS receiver for automotive applications, both hardware and software, based on a moving array antenna. While there is a lot of prior art on GNSS antenna array techniques, and some on extending a single GNSS antenna into a synthetic array, there are no documented real-life…
-
Start date: 12/02/2026Duration: 18 MonthsThe aim of the project is to demonstrate selected time and frequency transfer (UTC) techniques based on fibre optic networks. The implementation of such techniques, complementary to GNSS, is crucial to ensure the proper functioning of both the Critical National Infrastructure (CNI) and the various sectors of the economy. The project involves demonstrating two alternative scenarios for…
Prime contractor
Subcontractors
Name: PTB (Physikalisch-Technische Bundesanstalt)
Country: Germany
Website: https://www.ptb.de/cms/en.html
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/
-
Start date: 11/02/2026Duration: 24 MonthsThe project will pave the way for a next-generation, high-performance GNSS receiver chipset with native support for LEO-PNT signals. By combining the resilience of emerging LEO constellations with the maturity of established MEO systems, the chipset will deliver superior accuracy, robustness, reliability, and availability across automotive, industrial, and consumer markets. The phased development…