Filter By
-
Start date: 16/07/2025Duration: 24 MonthsTo investigate new concepts for ultra-accurate formation flying systems and initiate the develop a proof-of-concept software simulator on selected critical technologies. Main Outputs: Survey of state of the art, study of the possible concepts, enabling technologies and associated trade-offs Concept simulator (SW) Roadmap for technology maturation up to in-orbit demonstration, for instance…
Prime contractor
Name: Thales Alenia Space Italy
Country: Italy
Website: https://www.thalesgroup.com/en/global/activities/space
Subcontractors
-
Various 5G terrestrial positioning techniques have been studied and demonstrated by the 3GPP, so positioning accuracy and availability with 5G terrestrial networks is a well- established concept and several positioning methods are defined in 3GPP; however, position integrity with 5G private networks seams largely un-investigated. If 5G is to be used for reliable positioning, then further…
Prime contractor
Subcontractors
Name: University of York
Country: United Kingdom
Website: https://www.russellgroup.ac.uk/our-universities/university-york
-
Start date: 01/07/2025Duration: 36 MonthsSpirent is aiming to develop and provide a test framework for PNT resiliency testing for users, operators, and providers of Critical National Infrastructure (CNI). The proposed framework will consist of the Spirent PNT Alliance, the Spirent Shopfront and the Resilient PNT Assessment Scheme, and will provide support to each of the ten points of the UK government’s Resilient PNT strategy [17], by…
Prime contractor
Name: Spirent
Country: United Kingdom
Website: https://www.spirent.com/products-for/positioning-navigation-timing
-
Start date: 01/07/2025Duration: 24 MonthsA community-powered GNSS reference station network developed by onocoy enables the mass adoption of high-precision satellite positioning. The disruptive approach of decoupling the operation of reference stations from the delivery of correction services, and establishing a shared platform for such data, makes it possible to create a network with unprecedented coverage and density. The benefits are…
Subcontractors
-
Start date: 30/06/2025Duration: 18 MonthsThe SoLPOINT project addresses the critical challenge of ensuring the safe operation of highly automated trucks, which is crucial for the advancement of autonomous driving. In accordance with emerging regulations like the German Act on Autonomous Driving (§AFGBV = “Autonome-Fahrzeuge-Genehmigungs-und-Betriebs-Verordnung”), SoLPOINT will develop and implement a state-of-the-art technical…
-
Start date: 23/06/2025Duration: 9 MonthsThe project addresses the increasing relevance of Positioning, Navigation, and Timing (PNT) technologies as critical enablers for Advanced Driver Assistance Systems (ADAS) and Autonomous Driving (AD) across diverse operational environments in land mobility.
-
Start date: 17/06/2025Duration: 24 MonthsThere is increasing worldwide dependency on global navigation satellite systems (GNSS) that deliver uninterrupted timing signals. This GNSS dependency is driving novel holdover clock development to flywheel over periods when the GNSS signal is unavailable. Enhanced GNSS with next-generation optical clock technologies could facilitate both significantly reduced positioning errors and improved…
Prime contractor
Subcontractors
Name: Opto-Electronics Research Centre (University of Southampton)
Country: United Kingdom
Website: https://www.southampton.ac.uk/about/faculties-schools-departments/optoelectronics-research-centre
-
097 - Use of ML Tech. to Optimize the Adaptive beam-Steering Capabilities of CRPAs for GNSS Receiver
Start date: 16/06/2025Duration: 24 MonthsScope of the project is to perform activities and provide deliverables in relation to Use of ML techniques to optimize the adaptive beam-steering capabilities of CRPAs for GNSS user receivers. The core objectives of the project are: • Identify the best ML algorithm for adaptive null-steering beamformer with a compact antenna (elements spacing <λ/2) • Develop and evaluate the real-time…Subcontractors
-
Start date: 16/06/2025Duration: 12 MonthsNeuraspace proposes a GNSS-based project to enhance satellite navigation and space traffic management. The project focuses on three features that will strengthen Neuraspace’s Space Domain Awareness platform. First, GNSS Data Cleanup will remove biases and outliers from GNSS inputs, improving reliability. Second, GNSS Orbit Determination Accuracy will deliver precise orbit and covariance outputs…
-
Start date: 13/06/2025Duration: 12 MonthsThe NAVISP Geodesy-Enabled Applications project builds on the advancements expected from the ESA Genesis mission, which enhances geodetic reference frame accuracy and interoperability. The project’s tasks include analysing trends, engaging stakeholders, and identifying key innovations to drive the adoption of high-accuracy positioning services. By improving Precise Orbit Determination (POD) and…
Prime contractor
Name: Wroclaw University of Environmental and Life Sciences
Country: Poland
Website: https://upwr.edu.pl/en/