Filter By
-
Start date: 23/02/2024Duration: 24 MonthsThe scope of the work is to implement a multichannel disciplined oscillator which will optimally combine a set of independent information (GNSS, ADS-B, PTP/NTP) in order to provide Time and Frequency with the highest level of protection against GNSS attacks. In fact, the proposed system will implement a set of countermeasures able to detect and to resist to spoofing, meaconing and even jamming…
Subcontractors
Name: INRiM - Istituto Nazionale di Ricerca Metrologica
Country: Italy
Website: https://www.inrim.it/
-
Start date: 09/02/2024Duration: 18 MonthsAssured PNT refers to the technical process of ensuring that PNT data is reliable, accurate, resilient, and of high quality, while 'Trust' refers to our confidence in the system's performance. 'Trust' is therefore based on the combined level of assurance and confidence provided by the PNT data. Currently, PNT data within C-ITS is considered 'trusted,' but there is no…
Prime contractor
Name: WMG, University of Warwick
Country: United Kingdom
Website: https://warwick.ac.uk/fac/sci/wmg/
Subcontractors
-
Start date: 06/02/2024Duration: 24 MonthsThe NUMEROSO activity aims to assess the benefits of integrating Signals of Opportunity (SOOPs) with GNSS signals for navigation purposes, considering both terrestrial (such as 5G mobile or WiFi) and space-based (such as those transmitted by LEO satellites, or non-terrestrial networks) SOOPs. Leveraging advanced machine learning (ML) techniques, NUMEROSO will make use of SOOPs to enhance…
Subcontractors
-
Start date: 31/01/2024Duration: 24 MonthsOptical atomic clocks offer the potential for a new era of timekeeping, with laboratory systems at the world’s leading NMIs already demonstrating 100x improvements in accuracy compared with the microwave fountain clocks that offer the best realisations of the SIsecond. Enhanced PNT systems with these next-generation clock technologies could facilitate GNSS constellations with significantly-…
Prime contractor
-
Start date: 25/01/2024Duration: 18 MonthsIndustrial players face significant difficulties in assessing the vulnerability of their GNSS solutions against interference threats. They are unable to make informed decisions to protect themselves against the feared risks. The effects vary considerably from one type of jamming to another, and from one GNSS receiver to another. As far as spoofing attacks are concerned, countermeasure devices are…
Subcontractors
-
Start date: 15/01/2024Duration: 22 MonthsRelative navigation technologies are crucial for advanced space missions. In the NewSpace market, there are two key trends that are revolutionising spaceflight: Distributed Space Systems (DSS) and In-Space Logistics. Determining the relative states between satellite vehicles is fundamental in S/C formation flying and rendezvous. Global Navigation Satellite Systems (GNSS) can provide…
Prime contractor
-
WISDOM (Wise Integration of Satellites PNT tracking Data using OWL for collision avoidance Management) is an ESA NAVISP-supported project that develops and demonstrates technologies for autonomous satellite collision avoidance. The mission will be carried out with a 6U CubeSat that separates into two 3U CubeSats, each equipped with GNSS and the OWL (Orbital Whereabout Locator) system for…
Subcontractors
-
Start date: 01/01/2024Duration: 12 MonthsIn the LEO project the next generation of modulators integrated on a silicon nitride platform will be realized. We will use the technique of micro-transferprinting to integrate lithium niobate on top of silicon nitride waveguides. This back-end integration allows for being compatible with wafer scale processing in CMOS fabs. The modulators are targeting bandwidths beyond 100 Ghz
-
Start date: 31/12/2023Duration: 18 MonthsFirst time development of an on-board autonomous digital beamforming of multiple beams for small/compact new space payloads, with medium/large number of channels supported. The innovation also relies on the number of channels, dynamic beamforming, low power. The activity will review the digital beamforming requirements for GNSS-R and Radio Occultation payloads, define a digital processor…
Subcontractors
-
Start date: 15/12/2023Duration: 24 MonthsIn the last years there has been a growing interest in Low Earth Orbit (LEO) constellations to provide telecommunication and navigation PNT services, both from commercial and governmental entities. ESA’s LEO PNT constellation proposes an augmented-PNT service compared to the classical MEO or GEO satellites in current GNSS systems. In this context, GMV proposes the development of an Engineering…