Filter By
-
Start date: 15/12/2023Duration: 24 MonthsThe scope of the project is the design of an IC integrated circuit (single die) that implements the front-end receiver section of GNSS multi-band signal receiver space-born platforms. The frontend receiver includes all the circuits from the antenna to the ADC output and provides the digitalised output to the GNSS units base-band processors or SW receivers. The target applications are all GNSS…
-
Start date: 05/12/2023Duration: 24 MonthsThe objective of ACTOR (AuthentiCation Techniques for Optical time-transfeR) is to design, develop, manufacture and validate an authentication method for high-accuracy time transfer techniques over optical fibre, without a major loss of accuracy. The system is composed of a master and a slave demonstrator unit, each including software (SW)/protocol allowing authentication and integrity protection…
Subcontractors
Name: PTB (Physikalisch-Technische Bundesanstalt)
Country: Germany
Website: https://www.ptb.de/cms/en.html
-
Start date: 01/12/2023Duration: 24 MonthsCurrently, most of the launchers rely on inertial navigation, which introduces fundamental limitations both at performance and economical levels. In this scenario, hybrid solutions making use of GNSS capabilities emerge as an interesting alternative. One of the most mature initiatives within Europe, promoted by ESA and AVIO, consists of the development of a hybrid navigation unit for the future…
Subcontractors
-
Start date: 30/11/2023Duration: 18 MonthsThe principal aim of this project is to explore the applicability of today optics and photonic technologies to GNSS receivers. It is not always straightforward to understand which part of an electronic system may be conveniently replaced by its “photonic” counterpart, with clear advantages in terms of performance, integration density, power consumption, weight, EM immunity and…
Subcontractors
Name: TeCIP Institute of Sant’Anna School of Advanced Studies
Country: Italy
Website: https://www.santannapisa.it/en
Name: Thales Alenia Space Italy
Country: Italy
Website: https://www.thalesgroup.com/en/global/activities/space
-
Start date: 26/09/2023Duration: 12 MonthsFollowing the Dutch studies on GNSS vulnerabilities IKUS-I and IKUS-II, it was found that GNSS knowledge within organizations from the Dutch Critical Infrastructure sectors requires to be deepened and distributed. To protect Critical Infrastructure during their operations, there is a clear need to be aware of what GNSS is, what the dependencies including the risks are for an organisation and how…
Subcontractors
Name: Stichting Nationaal Lucht- en Ruimtevaartlaboratorium (NLR) National Aerospace Laboratory
Country: Netherlands
Website: https://www.nlr.org/space/
-
Start date: 01/09/2023Duration: 30 MonthsThis objective of the ARLI project is to develop an autonomous Unmanned Ground Vehicle (UGV) that can supply municipalities with a digital twin of the city. The digital twin is to be continuously updated and will serve as a tool for detection and planning of several service- and maintenance related task. In the project, a UGV will be integrated with a LiDAR sensor, that makes accurate 3D…
Prime contractor
Name: Technical University of Denmark (DTU)
Country: Denmark
Website: https://www.space.dtu.dk/english
Subcontractors
-
In the context of the renewed interest in lunar exploration, the need for preparing the future user instrument for the new positioning service on the Moon has become very important, in particular for supplementing the current navigation techniques based on inertial sensors and cameras. A significant R&D effort is ongoing towards the development of dedicated lunar infrastructures for enhanced Moon…
Subcontractors
-
Start date: 11/08/2023Duration: 36 MonthsGMV’s end-to-end Safe HA solution comprises a complete E2E chain of elements from GNSS sensor stations and SSR corrections to the end user on-board Positioning Engine. The scope of the ENGINE project is to design, develop, validate and incorporate into an already operational service a set of new features and evolutions. The final goal will be to improve the positioning solution performance,…
-
Start date: 11/06/2023Duration: 24 MonthsCoherent Clock project will build a resilient and secured GNSS time solution based on several GNSS receivers distributed at metro-wide distances and able to combine their timing information into one global solution to optimize the accuracy of the time source and to provide synchronization to the core and aggregation network. This ground-based time distribution system is based on the use of the…
Prime contractor
Name: Safran Electronics & Defense Spain S.L.U.
Country: Spain
Website: https://www.safran-group.com/
-
Start date: 25/05/2023Duration: 30 MonthsThe Voliera (overall) project has been conceived to develop a stand-alone localization platform independent from the current on-board subsystem with the aim to minimize the wayside components linked to the localization. Voliera project foresees different phases by following an engineering development. In the phase 2 there are 2 main goals: -develop the tools needed to verify the properties…
Subcontractors