Filter By
-
Start date: 27/05/2024Duration: 19 MonthsThis project outlines a strategic plan of activities to elevate the Technology Readiness Level (TRL) of Precise Positioning and timing receiver for LEO applications (NAVTIME-RX) from TRL 5 to TRL 7. The project is based on SEXTANS receiver heritage and aims to accelerate the development and maturation of the GNSS receiver technology, positioning it closer to commercial readiness through the…
Prime contractor
Subcontractors
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/
-
The proposed project develops the concept of orbit and clock determination for a LEO PNT system that uses high-precision on-board GNSS receivers providing POD in real time, and a reduced infrastructure in the ground segment. It also analyses the user segment, characterising the performance of the LEO PNT in the precise PPP positioning, evaluating the improvements in availability and convergence…
Subcontractors
-
Start date: 09/05/2024Duration: 36 MonthsGSAB2 – Grimaldi Satellite Assisted Berthing 2 is a premiere and flagship project, awarded by ESA – NAVISP 2 program to an international consortium led by Grimaldi in partnership with Kongsberg (Norway), Radiolabs (Italy) and Rina Services S.p.A. (Italy) targeting the assisted berthing operations with big vessels as the PCTC – Pure Car & Truck Carriers. GSAB2, which is the evolution of the…
Prime contractor
Subcontractors
-
Start date: 04/04/2024Duration: 18 MonthsGLF solution is a GNSS technology downstream application (PNT User Segment) for precise positioning of football players during a match, representing an effective and innovative value-added tool for real time football performance monitoring. Without the installation of infrastructures in the stadium, the GLF device will allow calculation of “live” metrics to be used by the football team…
Subcontractors
-
Start date: 03/04/2024Duration: 24 MonthsThe traditional mathematical approach to deriving Position Navigation and Timing (PNT) data from Global Navigation Satellite Systems (GNSS) does make some assumptions about the data being received. Machine Learning (ML) techniques could be used to instead of these traditional techniques to integrate GNSS signals and Signals of Opportunity (SOOP) signals in a way that doesn’t make these…
Prime contractor
Subcontractors
-
Start date: 02/04/2024Duration: 12 MonthsThe objective of this activity is to develop a toolkit to support engineering activities for LEO PNT systems. The goal is to accelerate the design, development and planning of such systems, not only from a signal simulation capability based on COTS, but also making available fast-prototyping tools to check for receiver performance, focusing on signal processing aspects.
-
Start date: 31/03/2024Duration: 18 MonthsThe “Maritime Autonomous Navigation using Alternative Absolute positioning techniques” (MANAA) project will provide new ways of integrating millennia old celestial navigation techniques with state-of-the-art technology and thinking, whilst developing visual and non-visual spectrum optical techniques and sensors with the potential to observe celestial bodies independently of the lighting and…
Prime contractor
-
Start date: 13/03/2024Duration: 24 MonthsThe goal of this proposal is to develop a novel product named SeCure AutheNtication Server (SCANS) that would provide the CAS encrypted snippets for the corresponding period and encryption/decryption functions in a centralized secure server. This approach would permit to simplify the CAS user terminals thus facilitating the adoption of the CAS service. Main functionalities will be: Galileo…
-
Start date: 08/03/2024Duration: 24 MonthsSENTINEL is an innovative project that aims to develop a comprehensive solution for monitoring the use of earth moving machines and addressing the crucial challenges of theft prevention and ensuring correct machine usage. The earthmoving machines market, a significant sector in the construction and mining industry, has witnessed a growing trend towards equipment rental and leasing, both in Europe…
Subcontractors
-
Start date: 08/03/2024Duration: 6 MonthsIn recent years, IoT applications have grown by leaps and bounds, however, due to its typically small physical size, only a small battery can fit inside a compact enclosure. This means energy usually comes at a high premium. Traditional GNSS chipsets consume too much energy, many IoT applications must either give up offering geolocation functions or suffer from short battery life. For IoT…
Prime contractor