Filter By
-
Start date: 15/01/2023Duration: 24 MonthsThe world economic trade has continuously increased over the past decades. For the maritime business, this had led to larger and larger ships and denser traffic. Examples of famous waterways are the Suez Channel, the Kiel Channel, and the Malakka Strait near Singapore. The latter one is passed by 200 to 250 container ships daily that transport 25 % of the global maritime transportation…
Prime contractor
Subcontractors
-
Start date: 21/12/2022Duration: 18 MonthsGNSS such as GPS are vulnerable, largely due to the tiny signal strength and the geometry of satellites in urban environments. Drone regulatory frameworks are progressing to where autonomous flight and operations Beyond Visual Line-Of-Sight (BVLOS) are a possibility, thus driving the need for reliable navigation services to complement or act as a back-up to existing ones (chiefly GNSS). Trusted…
Prime contractor
Subcontractors
-
Start date: 15/12/2022Duration: 24 MonthsThe PNT Moon surface Beacon and Reference Station (referred to as Moon Station) is an important component of the future LCNS system. The LCNS system will initially foresee the deployment of dedicated lunar orbiting ranging satellites, whereas the Moon Stations, as part of the LCNS surface infrastructure, will be deployed at a subsequent stage. Nonetheless, it is deemed important to implement…
Subcontractors
-
Start date: 13/12/2022Duration: 12 MonthsMoon exploration is emerging as the next global strategic priority in space exploration. Several dozens of commercial and institutional missions to the Moon are planned for the coming decades, with a major contribution also expected from ESA (e.g. Orion service module, ESA participation in Gateway lunar station and contribution to multiple lunar robotic missions). In spite of the wide variety of…
Prime contractor
Subcontractors
-
128 - Monitoring and Estimation of Drones’ passage for augmented Security in critical Areas (MEDuSA)
Start date: 09/12/2022Duration: 24 MonthsDue to the rapidly increasing number of leisure drones operated everywhere, different accidental and deliberate incidents happen and even are becoming severe when happened in a critical area, like, for example, airports, ports, events in city areas, etc… As it is possible to see from the table below, some examples of incidents in different domains have demonstrated the need for an effective…Subcontractors
-
Start date: 10/11/2022Duration: 18 MonthsThe objective of LOCFIT (LOCalisation For Iot and Tracking) project is to develop innovative and robust infrastructure-based position-bounding solutions that exploit satellite uplink measurements of connected devices. Targeted users are low energy and low cost devices, with long life duration without maintenance, dedicated to : Land transportation: tracking of critical…
Prime contractor
Subcontractors
-
Start date: 01/11/2022Duration: 18 MonthsIn the world of avionic systems, we observed a transition from federated avionics architectures to Integrated Modular Avionics (IMA) where IMA architectures provide a shared computing platform, communications, and I/O resource pool that is partitioned by multiple tasks of differing design assurance criticalities. A similar transition is currently observed in the world of satellite systems. The…
Prime contractor
-
Start date: 06/10/2022Duration: 18 MonthsThe activity is a development and qualification of a Compact Versatile SBAS down converter, for use in GEO and MEO Satellites distributing augmentation data for more accurate positioning. Satellite Based Augmentation Systems have regional systems like EGNOS in Europe, WAAS in the US, MSAS in Japan and so on. Such functions have been embarked on multiple satellites of the last decades, and will…
Prime contractor
-
This project aims at implementing the Beidou signals B1 and B3 on Syrlinks GNSS receiver product. The Syrlinks receivers are based on a common SDR hardware platform designed for small satellites. The receiver already works with GPS and Galileo signals and will extended to make a autonomous PVT (Position, Velocity and Time) based only on Beidou signals. Whatever signals come from, GPS, Galileo,…
-
Start date: 15/07/2022Duration: 18 MonthsThe main objective of the AALTO (Advanced ALgorithms and techniques for resilient Time prOvision) project is to combine different time sources with advanced algorithms, in particular Kalman filtering (in phase and frequency) and Machine Learning (ML) techniques, in order to provide the required level of time accuracy, stability, availability and integrity to timing users. Two hardware and…