Events
-
Final Presentation NAVISP EL1-023 bis "LunaNet Software Defined Receiver”
Start date: 05/06/2026 10:00
End date: 05/06/2026 11:30
All day event: No
The final presentation of the LunaNet Software Defined Receiver activity, will present the design of a LunaNet Augmented Forward Signal (AFS) receiver breadboard (LunaNet is a system of systems aiming… -
Final Presentation NAVISP EL3-045 "PNT Innovation Institute"
Start date: 28/05/2026 10:30
End date: 28/05/2026 12:00
All day event: No
Satellite Applications Catapult, NLA International Ltd and ReThinkPNT have conducted a detailed investigation into the feasibility of a PNT Innovation Institute (PNTII) for the UK. Several industrial… -
Final Presentation NAVISP EL2-177 "GEOTRUST”
Start date: 13/05/2026 14:00
End date: 13/05/2026 15:30
All day event: No
The project explored different testing methods to assess how vulnerable GNSS receivers are to expected threats, including jamming, spoofing, and meaconing. The goal was to recommend robust methods… -
Final Presentation NAVISP EL1-073 "Trusted PNT for Unmanned Aerial Systems"
Start date: 13/05/2026 10:00
End date: 13/05/2026 11:30
All day event: No
The final presentation of the Trustworthy PNT for Aerial Systems (TOPASE) activity, developed by Thales Alenia Space France SAS with ABZero Srl, University Politechnica Timisoara (UPT) and Drone Volt… -
Final Presentation NAVISP EL1-069 "LUPIN: Enabling High Performance PNT in the Lunar Environment"
Start date: 12/05/2026 10:00
End date: 12/05/2026 11:30
All day event: No
How well can Moonlight support precise lunar surface navigation? The final presentation of the LUPIN activity (NAVISP‑EL1‑069) will reveal the answer, drawing on real‑world field trials and an… -
Final Presentation NAVISP EL2-174 "A WR Based Implementation of Coherent Clock "
Start date: 29/04/2026 15:00
End date: 29/04/2026 16:30
All day event: No
The final presentation of the WR based implementation of Coherent Clock, developed by Safran Electronics and Defense Spain under ESA’s NAVISP-EL2-174 project, will summarize the outcomes of this… -
Final Presentation NAVISP EL2-180 "LEO PNT Engineering Support Tools (LEOPEST)"
Start date: 16/04/2026 15:00
End date: 16/04/2026 16:30
All day event: No
The final presentation of the LEO PNT Engineering Support Tools (LEOPEST) activity, developed by GMVIS SKYSOFT S.A. under ESA’s NAVISP-EL2-180 project, will summarize the outcomes of this… -
Start date: 08/04/2026 10:00
End date: 08/04/2026 11:30
All day event: No
Through the NAVISP EL1088 bis JLR successfully delivered the Factor Graph Optimisation Navigation Unit (FGO-Nav) — a next generation proof-of-concept platform advancing the state of the art in GNSS… -
Final Presentation NAVISP EL3-043 "SecureUTM 2 Phase 1"
Start date: 03/03/2026 10:00
End date: 03/03/2026 11:30
All day event: No
The Secure UTM 2 project addresses the need to systematically integrate cybersecurity considerations into U-space and Unmanned Traffic Management (UTM) systems, in line with the increasing complexity,… -
Final Presentation NAVISP EL2-232 "DroneHome2"
Start date: 26/02/2026 10:30
End date: 26/02/2026 12:00
All day event: No
The final presentation of the DroneHome 2 activity, performed within ESA’s NAVISP Element 2 programme (NAVISP-EL2-232), will summarise the outcomes of the project and the results achieved. DroneHome…