-
Start date: 01/07/2024Duration: 14 MonthsIn the context of the intensified jamming and spoofing activities, mitigation measures need to be employed to protect civilian users from the negative effects of interference. In line with the efforts of providing better solutions for resistance to interference, the ECHO-NN project proposes the enhancement of classical interference detection and localization algorithms with artificial…
Prime contractor
Subcontractors
-
Start date: 31/12/2023Duration: 18 MonthsFirst time development of an on-board autonomous digital beamforming of multiple beams for small/compact new space payloads, with medium/large number of channels supported. The innovation also relies on the number of channels, dynamic beamforming, low power. The activity will review the digital beamforming requirements for GNSS-R and Radio Occultation payloads, define a digital processor…
Subcontractors
-
Start date: 01/12/2021Duration: 12 MonthsThe objective of this project is to demonstrate that crowd-sensed GNSS signals can be effectively used as the sole (or main) data source for an integrity service. Integrity will be provided by allowing the user to assess his guaranteed positioning performance. This is achieved by providing statistical bounds to the residual error components (after applying potential corrections and removing…
Prime contractor
Subcontractors
-
The SRX project aims to develop an industrial prototype of a multi-GNSS multi-frequency GNSS receiver module, offering high-precision positioning and heading capability in adverse signal environments like forests. The usage of Galileo E5ab and BeiDou-3 B2 ACE-BOC wide-band signals integrated with MEMS sensor measurements is considered a key here to achieve robust vector tracking based solutions…
Subcontractors
- ‹ prev
- 1
- next ›