Filter By
-
Start date: 30/11/2024Duration: 18 MonthsThe main objective of this activity is to investigate innovative navigation algorithms exploiting FGO, both for a standalone GNSS unit and in combination with other sensors (INS), and for different receiver grades (including high- and low-quality modules). The activity will benchmark both the potential accuracy improvement and the computational cost of the proposed algorithms (in view of realtime…
Subcontractors
-
Start date: 30/11/2024Duration: 18 MonthsSome of the greatest challenges that connected and automated ground vehicles face are safe path planning, navigation, self-localisation and positioning. This includes the system being able to reason about its environment and decide which path to take or being able to re-plan should the initial path present obstacles or traffic. JLR aims to develop a testbed capable of testing a Factor Graph…
Prime contractor
-
Start date: 30/11/2024Duration: 18 MonthsThe main objective of the project is to assess the utilization of Factor Graph Optimization (FGO) for GNSS-based (Global Navigation Satellite Systems) positioning, navigation, and timing (PNT) determination. This picks up on recent research suggesting that the results from FGO are superior to those of conventional Bayes filters. As the basis for the evaluation, an FGO-based navigation engine and a…
Subcontractors
Name: TU Graz University of Technology
Country: Austria
-
Start date: 30/11/2024Duration: 15 MonthsEnhanced Positioning services on authenticated Enterprise Infrastructure, EPISODE, for the first time, delivers a positioning and navigation-aware, analytical, and business integration-ready platform that can provide GNSS-like capability in ALL GNSS-denied areas globally, allowing legacy and new ‘fixed’ infrastructure that is enabled through the latest, best-of-breed, terrestrial PNT enabled…
-
Start date: 28/11/2024Duration: 12 MonthsA concept for precise Time Transfer via Viasat’s Global Xpress (GX) satellites in GEO, ultimately independent of any GNSS, has been developed and referred to as Global Xpress Time Transfer. The concept uses enhanced orbit determination data and will make use of Code Division Multiple Access (CDMA) signals in the global beam of the satellite adjacent to the global signalling channel. In the first…
Subcontractors
-
Start date: 27/11/2024Duration: 18 MonthsThis project is motivated by the introduction of regulatory requirements relating to the transport of dangerous or controlled materials, safely, securely, and affordably. Hazardous materials are defined under the Transport of Dangerous Goods acts, while controlled materials are defined under the Supply-Chain Due Diligence acts. The intention is to offer a service to large scale enterprises…
-
Start date: 25/11/2024Duration: 10 MonthsPower Grid Guard Analyser (PG2A) is a product that addresses the limitations of existing power management solutions. In the context of crisis management for critical infrastructure - particularly hospitals - PG2A offers dynamic, near-real-time power consumption, production and provisioning analysis for internal and external assets. This solution enables economically justified contracts for…
-
Start date: 10/11/2024Duration: 24 MonthsThe proposed project seeks to develop a GNSS interference testbed for autonomous mobility including a methodology for testing and certifying GNSS interference with focus on jamming and spoofing threats. The current project will encompass the development of GNSS interference test scenarios, test and set-ups, testing executions, analysis of test results. The outcome of the project will be a…
Prime contractor
-
Start date: 07/11/2024Duration: 18 MonthsFactor graphs are widely used in robotics, especially for simultaneous localization and mapping, but also in filtering and smoothing, model-based signal processing, artificial intelligence, coding and decoding. They serve as probabilistic models where variable nodes are associated with system states, and factors are associated with measurements. The factor graphs techniques have been applied to…
Subcontractors
-
Start date: 04/11/2024Duration: 31 MonthsThis project aims to develop vehicular antennas for PNT and 5G/6G SatCom/Cellular applications, which are integrated into the glass roof of a car. Antennas will be designed, prototyped and benchmarked towards current state-of-the-art. By using transparent (or hidden) glass integrated vehicular antenna systems, Volvo Cars not only improves car design and carbon footprint, but also strengthens…