Filter By
Element 2 - Competitiveness in PNT
-
Start date: 11/08/2023Duration: 36 MonthsGMV’s end-to-end Safe HA solution comprises a complete E2E chain of elements from GNSS sensor stations and SSR corrections to the end user on-board Positioning Engine. The scope of the ENGINE project is to design, develop, validate and incorporate into an already operational service a set of new features and evolutions. The final goal will be to improve the positioning solution performance,…
-
Start date: 11/06/2023Duration: 24 MonthsCoherent Clock project will build a resilient and secured GNSS time solution based on several GNSS receivers distributed at metro-wide distances and able to combine their timing information into one global solution to optimize the accuracy of the time source and to provide synchronization to the core and aggregation network. This ground-based time distribution system is based on the use of the…
Prime contractor
Name: Safran Electronics & Defense Spain S.L.U.
Country: Spain
Website: https://www.safran-group.com/
-
RelyMap Connect is analytical software that improves GNSS location calculation performance in complex urban environments. During this activity, Envisage Space Ltd, supported by Cranfield University, will further develop, validate, integrate and demonstrate our technology in multiple city areas of interest. Further, Envisage will be engaging with specific market sectors with the aim of validating…
Prime contractor
Subcontractors
-
Start date: 25/05/2023Duration: 30 MonthsThe Voliera (overall) project has been conceived to develop a stand-alone localization platform independent from the current on-board subsystem with the aim to minimize the wayside components linked to the localization. Voliera project foresees different phases by following an engineering development. In the phase 2 there are 2 main goals: -develop the tools needed to verify the properties…
Subcontractors
-
Start date: 12/05/2023Duration: 16 MonthsCHARLI project aims to offer a new localization service to make rescue workers safer during an intervention. Today, no commercialized solution meets the requirements of precise and reliable tracking of emrgency agents: agents still die due to a lack of positioning solution. CHARLI solution is based on a foot-mounted localization device and innovative alogorithms that allow the poition
Subcontractors
-
Start date: 25/03/2023Duration: 18 MonthsThe objective of the activity is to develop a manufactor a prototype of an intgerated multi band and multi constellation GNSS antenna for high precision on ground applications.
-
Start date: 21/03/2023Duration: 16 MonthsThe activity is a development of a space segment compact C-Band LNA for use in Geostationary and Non-Geostationary Orbits. Its primary target is SBAS applications, but the Product will be capable to cover the full C-Band. The key function of the unit is to receive a signal at Uplink C-Band to feed the signal into the C-to L-Band downconverter for L-Band signal processing. Typical input signals…
Prime contractor
-
Start date: 06/02/2023Duration: 14 MonthsTo address higher requirements in the GNSS market, in particular the reception of signals with higher bandwidth and poor amplitude levels, Saphyrion has developed, through an ESA contract the next generation of GNSS RF-Front-end ASICs, called SY1009 and the SY2001. The SY1009 is a radiation hardened L-band RF down-converter for GNSS receivers. The SY2001 is a radiation hardened fractional-N…
-
128 - Monitoring and Estimation of Drones’ passage for augmented Security in critical Areas (MEDuSA)
Start date: 09/12/2022Duration: 24 MonthsDue to the rapidly increasing number of leisure drones operated everywhere, different accidental and deliberate incidents happen and even are becoming severe when happened in a critical area, like, for example, airports, ports, events in city areas, etc… As it is possible to see from the table below, some examples of incidents in different domains have demonstrated the need for an effective…Subcontractors
-
Start date: 01/11/2022Duration: 18 MonthsIn the world of avionic systems, we observed a transition from federated avionics architectures to Integrated Modular Avionics (IMA) where IMA architectures provide a shared computing platform, communications, and I/O resource pool that is partitioned by multiple tasks of differing design assurance criticalities. A similar transition is currently observed in the world of satellite systems. The…
Prime contractor