Filter By
-
Artificial intelligence (AI) is increasingly utilized in the PNT field, enhancing the performance and reliability of Global Navigation Satellite Systems (GNSS), from RF interference detection and mitigation to sensor fusion. The advancement and ever-increasing size of neural networks increase the complexity of applications supported by AI, and with the increasing complexity, verifiability…
Subcontractors
Name: Budapest University of Technology and Economics
Country: Hungary
Website: https://www.bme.hu/en
-
Start date: 10/06/2024Duration: 6 MonthsThe UPDATE project will serve to define requirements, architecture and a development plan for a Minimum Viable Product (MVP) of a UK National PNT Digital Twin Environment (DTE). The MVP will meet the immediate needs of the UK Government with respect to delivery of its Policy Framework for Greater PNT Resilience (10-point plan). It will provide data in support of the development of business cases…
-
Start date: 01/06/2024Duration: 18 MonthsMain goal of the FAIR project is the demonstration in a real environment of a prototype for the mitigation of scintillation and multipath effects on GNSS positioning. The prototype is enabled by a scintillation Forecasting Model, patented by SpacEarth Technology and by algorithms for multipath mitigation patented by GTER. The prototype includes: - an Elaborating Facility, performing the…
Subcontractors
-
Start date: 01/06/2024Duration: 26 MonthsThe specific objective of this NAVISP project is the development of an SDR processor devoted to Low Earth Orbit (LEO) PNT applications. The LEO PNT system intends to provide services of accurate real-time positioning to complement the Global Navigation Satellite Systems (GNSS). A satellite constellation of LEO-PNT offers better signal power, that results in higher positioning accuracy and…
Prime contractor
-
Start date: 31/05/2024Duration: 18 MonthsA Shield Nanosatellite is an innovative and challenging idea that requires the integration of a wide array of technologies. OLAF leverages our company’s background experience and that of our partners in the areas touching with the main objectives of the tender. The main purpose of the mission is to use a space system for passively protecting space assets from space debris (and possibly…
Prime contractor
Subcontractors
Name: UNSTPB FIA (FAE)
Country: Romania
Website: https://upb.ro/en/faculties/the-faculty-of-aerospace-engineering/
-
Start date: 30/05/2024Duration: 18 MonthsThe “Maritime Autonomous Navigation using Alternative Absolute positioning techniques” (MANAA) project will provide new ways of integrating millennia old celestial navigation techniques with state-of-the-art technology and thinking, whilst developing visual and non-visual spectrum optical techniques and sensors with the potential to observe celestial bodies independently of the lighting and…
Prime contractor
Subcontractors
-
Start date: 27/05/2024Duration: 19 MonthsThis project outlines a strategic plan of activities to elevate the Technology Readiness Level (TRL) of Precise Positioning and timing receiver for LEO applications (NAVTIME-RX) from TRL 5 to TRL 7. The project is based on SEXTANS receiver heritage and aims to accelerate the development and maturation of the GNSS receiver technology, positioning it closer to commercial readiness through the…
Prime contractor
Subcontractors
Name: Space Research Centre Polish Academy of Science (CBK-PAN)
Country: Poland
Website: https://cbkpan.pl/en/
-
The proposed project develops the concept of orbit and clock determination for a LEO PNT system that uses high-precision on-board GNSS receivers providing POD in real time, and a reduced infrastructure in the ground segment. It also analyses the user segment, characterising the performance of the LEO PNT in the precise PPP positioning, evaluating the improvements in availability and convergence…
Subcontractors
-
Start date: 09/05/2024Duration: 36 MonthsGSAB2 – Grimaldi Satellite Assisted Berthing 2 is a premiere and flagship project, awarded by ESA – NAVISP 2 program to an international consortium led by Grimaldi in partnership with Kongsberg (Norway), Radiolabs (Italy) and Rina Services S.p.A. (Italy) targeting the assisted berthing operations with big vessels as the PCTC – Pure Car & Truck Carriers. GSAB2, which is the evolution of the…
Prime contractor
Subcontractors
-
Start date: 04/04/2024Duration: 18 MonthsGLF solution is a GNSS technology downstream application (PNT User Segment) for precise positioning of football players during a match, representing an effective and innovative value-added tool for real time football performance monitoring. Without the installation of infrastructures in the stadium, the GLF device will allow calculation of “live” metrics to be used by the football team…
Subcontractors