Start date: 13/09/2024Duration: 18 MonthsThe EPIC aims to address to develop algorithms and a SW simulator for combined usage of GNSS, LEO-PNT and 5G terrestrial transmitters to achieve high precision PPP-IAR solutions even in urban environments. The drivers for this activity are: ▪ Usage of alternative-PNT (LEO-PNT, 5G) means, in case GNSS is partially or fully not available ▪ Usage of additional-PNT (LEO-PNT, 5G) means…
Subcontractors
-
Start date: 11/09/2024Duration: 12 MonthsReliable Integer Ambiguity Resolution (IAR) of carrier-phase measurements is critical for Global Navigation Satellite Systems (GNSS) high accuracy positioning. State-of-the-art IAR strategies employ well-established processes (float estimation, decorrelation and searching) which, however, cannot deem efficient for real-time kinematic applications. Analytically, by virtue of weak models, biases…
Prime contractor
Subcontractors
-
Integer Ambiguity Resolution (IAR) concerns the successful resolution of unknown integer ambiguities present in carrier-phase measurements, which exhibit millimeter-level precision. In the context of Global Navigation Satellite System (GNSS) precise positioning and navigation, the IAR process is fundamental, as once ambiguities are correctly resolved, the phase data acts as ultra-precise…
Subcontractors
-
Start date: 12/07/2024Duration: 18 MonthsThe main technical objective of the activity is the design of a prototype receiving antenna in Ka-Band for satellite navigation. To reach this objective, suitable antenna design solutions will be identified that may fit to small satellite platforms (eg nU Cubesats), by either being small in dimensions of deployable. The proposed design concepts must meet the requirements for navigation functions…
Prime contractor
Subcontractors
-
Start date: 02/07/2024Duration: 9 MonthsPNT, the focus of NAVISP, is not just today’s largest contributor to the global Space Economy through the revenues generated by PNT-enabled downstream applications and services, but also an essential utility for many other economic sectors. NAVISP stimulates novel PNT concepts, supports industrial competitiveness, attracts industry co-finance and supports national PNT-related policies. After six…
Prime contractor
Subcontractors
-
Start date: 30/06/2024Duration: 18 MonthsThe main objective of this project is to develop and implement a combined eLoran and GNSS receiver, and demonstrate in a number of realistic scenarios that these can be combined to provide a more robust and reliable navigation solution. The project will be 15-18 months in duration, and will involve technology and concept research, design of the software and hardware, build, testing and an…
-
Start date: 30/06/2024Duration: 12 MonthsUnmanned Aerial systems (UAS) industry has undergone significant growth, propelled by advancements in miniaturization, cost-effectiveness and sensor fusion frameworks. However, this market is still lacking trustworthiness as enabler for safety-sensitive operations. To achieve scaled adoption, user acceptance, and compliance to regulatory and standardization ecosystem are key…
Prime contractor
Subcontractors
-
Start date: 30/06/2024Duration: 12 MonthsThis project aims to address the increasing drone safety risks by developing redundant sensing with an integrated multi-sensor system to ensure drone Positioning, Navigation, and Timing (PNT) in various conditions. As GNSS becomes more vulnerable, there is a need for more resistant and robust drone PNT, which would maintain the accuracy even in the absence of GNSS. We will develop a…
Subcontractors
-
Artificial intelligence (AI) is increasingly utilized in the PNT field, enhancing the performance and reliability of Global Navigation Satellite Systems (GNSS), from RF interference detection and mitigation to sensor fusion. The advancement and ever-increasing size of neural networks increase the complexity of applications supported by AI, and with the increasing complexity, verifiability…
Subcontractors
Name: Budapest University of Technology and Economics
Country: Hungary
Website: https://www.bme.hu/en
-
Start date: 31/05/2024Duration: 18 MonthsA Shield Nanosatellite is an innovative and challenging idea that requires the integration of a wide array of technologies. OLAF leverages our company’s background experience and that of our partners in the areas touching with the main objectives of the tender. The main purpose of the mission is to use a space system for passively protecting space assets from space debris (and possibly…
Prime contractor
Subcontractors
Name: UNSTPB FIA (FAE)
Country: Romania