Filter By
-
Start date: 30/11/2023Duration: 21 MonthsThe objective of this proposal is to conceive, design and validate a breadboard solution capable of detecting and localizing spoofing. This part is achieved by a monitoring node referred to as SILENT node, which is a disruptive solution that does not exist in current commercial solutions, and that has only been presented in academic papers. An additional SW tool will be developed in the frame of…
Subcontractors
-
Start date: 26/09/2023Duration: 12 MonthsFollowing the Dutch studies on GNSS vulnerabilities IKUS-I and IKUS-II, it was found that GNSS knowledge within organizations from the Dutch Critical Infrastructure sectors requires to be deepened and distributed. To protect Critical Infrastructure during their operations, there is a clear need to be aware of what GNSS is, what the dependencies including the risks are for an organisation and how…
Subcontractors
Name: Stichting Nationaal Lucht- en Ruimtevaartlaboratorium (NLR) National Aerospace Laboratory
Country: Netherlands
Website: https://www.nlr.org/space/
-
Start date: 01/09/2023Duration: 30 MonthsThis objective of the ARLI project is to develop an autonomous Unmanned Ground Vehicle (UGV) that can supply municipalities with a digital twin of the city. The digital twin is to be continuously updated and will serve as a tool for detection and planning of several service- and maintenance related task. In the project, a UGV will be integrated with a LiDAR sensor, that makes accurate 3D…
Prime contractor
Name: Technical University of Denmark (DTU)
Country: Denmark
Website: https://www.space.dtu.dk/english
Subcontractors
-
In the context of the renewed interest in lunar exploration, the need for preparing the future user instrument for the new positioning service on the Moon has become very important, in particular for supplementing the current navigation techniques based on inertial sensors and cameras. A significant R&D effort is ongoing towards the development of dedicated lunar infrastructures for enhanced Moon…
Subcontractors
-
Start date: 11/08/2023Duration: 36 MonthsGMV’s end-to-end Safe HA solution comprises a complete E2E chain of elements from GNSS sensor stations and SSR corrections to the end user on-board Positioning Engine. The scope of the ENGINE project is to design, develop, validate and incorporate into an already operational service a set of new features and evolutions. The final goal will be to improve the positioning solution performance,…
-
Start date: 11/06/2023Duration: 24 MonthsCoherent Clock project will build a resilient and secured GNSS time solution based on several GNSS receivers distributed at metro-wide distances and able to combine their timing information into one global solution to optimize the accuracy of the time source and to provide synchronization to the core and aggregation network. This ground-based time distribution system is based on the use of the…
Prime contractor
Name: Safran Electronics & Defense Spain S.L.U.
Country: Spain
Website: https://www.safran-group.com/
-
RelyMap Connect is analytical software that improves GNSS location calculation performance in complex urban environments. During this activity, Envisage Space Ltd, supported by Cranfield University, will further develop, validate, integrate and demonstrate our technology in multiple city areas of interest. Further, Envisage will be engaging with specific market sectors with the aim of validating…
Prime contractor
Subcontractors
-
Start date: 25/05/2023Duration: 30 MonthsThe Voliera (overall) project has been conceived to develop a stand-alone localization platform independent from the current on-board subsystem with the aim to minimize the wayside components linked to the localization. Voliera project foresees different phases by following an engineering development. In the phase 2 there are 2 main goals: -develop the tools needed to verify the properties…
Subcontractors
-
Start date: 12/05/2023Duration: 16 MonthsCHARLI project aims to offer a new localization service to make rescue workers safer during an intervention. Today, no commercialized solution meets the requirements of precise and reliable tracking of emrgency agents: agents still die due to a lack of positioning solution. CHARLI solution is based on a foot-mounted localization device and innovative alogorithms that allow the poition
Subcontractors
-
Start date: 25/03/2023Duration: 18 MonthsThe objective of the activity is to develop a manufactor a prototype of an intgerated multi band and multi constellation GNSS antenna for high precision on ground applications.