Start date: 25/03/2023Duration: 18 MonthsThe objective of the activity is to develop a manufactor a prototype of an intgerated multi band and multi constellation GNSS antenna for high precision on ground applications.
-
Start date: 23/03/2023Duration: 15 MonthsThe main objective of (VALLE) is to develop an innovative Privacy Preserving PNT concept that explore the possibilities and capabilities of the Privacy Enhancing Technologies, validating their functionalities but also non-functional aspects such as resilience and robustness by a dedicated red team analysis. The main goal of this project can be summarized as follows: • To identify, define and…
Subcontractors
-
Start date: 21/03/2023Duration: 16 MonthsThe activity is a development of a space segment compact C-Band LNA for use in Geostationary and Non-Geostationary Orbits. Its primary target is SBAS applications, but the Product will be capable to cover the full C-Band. The key function of the unit is to receive a signal at Uplink C-Band to feed the signal into the C-to L-Band downconverter for L-Band signal processing. Typical input signals…
Prime contractor
-
Start date: 12/02/2023Duration: 18 MonthsThe main aim of RIPTIDE_PHASE_2 follows the strategic view identified in the first RIPTIDE project and targets the continuation of the development of a resilient PNT solution dedicated to the particularities of the Black Sea and Danube Lower Basin region, to cover a national need of resilient PNT tailored to address a sensitive region of Romania and of the EU. It therefore aims at achieving the…
Prime contractor
Subcontractors
Name: Romanian Maritime Hydrographic Directorate
Country: Romania
Website: https://www.dhmfn.ro/index_en.shtml
-
Start date: 06/02/2023Duration: 14 MonthsTo address higher requirements in the GNSS market, in particular the reception of signals with higher bandwidth and poor amplitude levels, Saphyrion has developed, through an ESA contract the next generation of GNSS RF-Front-end ASICs, called SY1009 and the SY2001. The SY1009 is a radiation hardened L-band RF down-converter for GNSS receivers. The SY2001 is a radiation hardened fractional-N…
-
Start date: 15/01/2023Duration: 24 MonthsThe world economic trade has continuously increased over the past decades. For the maritime business, this had led to larger and larger ships and denser traffic. Examples of famous waterways are the Suez Channel, the Kiel Channel, and the Malakka Strait near Singapore. The latter one is passed by 200 to 250 container ships daily that transport 25 % of the global maritime transportation…
Prime contractor
Subcontractors
-
Start date: 21/12/2022Duration: 18 MonthsGNSS such as GPS are vulnerable, largely due to the tiny signal strength and the geometry of satellites in urban environments. Drone regulatory frameworks are progressing to where autonomous flight and operations Beyond Visual Line-Of-Sight (BVLOS) are a possibility, thus driving the need for reliable navigation services to complement or act as a back-up to existing ones (chiefly GNSS). Trusted…
Prime contractor
Subcontractors
-
Start date: 15/12/2022Duration: 24 MonthsThe PNT Moon surface Beacon and Reference Station (referred to as Moon Station) is an important component of the future LCNS system. The LCNS system will initially foresee the deployment of dedicated lunar orbiting ranging satellites, whereas the Moon Stations, as part of the LCNS surface infrastructure, will be deployed at a subsequent stage. Nonetheless, it is deemed important to implement…
Subcontractors
-
Start date: 13/12/2022Duration: 12 MonthsMoon exploration is emerging as the next global strategic priority in space exploration. Several dozens of commercial and institutional missions to the Moon are planned for the coming decades, with a major contribution also expected from ESA (e.g. Orion service module, ESA participation in Gateway lunar station and contribution to multiple lunar robotic missions). In spite of the wide variety of…
Prime contractor
Subcontractors
-
128 - Monitoring and Estimation of Drones’ passage for augmented Security in critical Areas (MEDuSA)
Start date: 09/12/2022Duration: 24 MonthsDue to the rapidly increasing number of leisure drones operated everywhere, different accidental and deliberate incidents happen and even are becoming severe when happened in a critical area, like, for example, airports, ports, events in city areas, etc… As it is possible to see from the table below, some examples of incidents in different domains have demonstrated the need for an effective…Subcontractors