Element 3 - Support to Member States
-
Start date: 03/08/2025Duration: 24 MonthsThe MAGMA (Magyar GNSS Monitoring Assessment) project is dedicated to designing a scalable national GNSS monitoring infrastructure. It focuses on four key technical areas: data collection, transport, processing, and dissemination. The project addresses the growing demand for reliable and secure GNSS usage by exploring infrastructure design options that align with Hungarian legal requirements…
Subcontractors
Name: Budapest University of Technology and Economics
Country: Hungary
Website: https://www.bme.hu/en
Name: Molaris IT Developing and Consulting Ltd
Country: Hungary
Website: https://molaris.hu/en/home/
-
Start date: 11/06/2025Duration: 12 MonthsThis project will conduct a detailed investigation into the feasibility for, and if feasible, propose a design for a non-governmental function - a PNT Innovation Institute (PNTII). Several industrial and academic entities, including the National PNT Office, have identified the need for such an institute at the outline level through workshops at the Satellite Applications Catapult and National…
Prime contractor
Subcontractors
-
Start date: 01/05/2025Duration: 15 MonthsTOUCAN will complement efforts to reestablish a UK Enhanced Long-Range Navigation (eLoran) system, which will serve as a terrestrial backup to satellite-based services. A critical goal is to ensure that this system operates independently of the more vulnerable Global Navigation Satellite Systems (GNSS). The project’s primary objective is to establish an accurate, independently verifiable…
Subcontractors
-
Start date: 10/02/2025Duration: 18 MonthsBuilding upon the results of the OpSTAR Phase 0 study carried out under NAVISP-EL2-139 by OHB Systems AG, the OpSTAR In-Orbit Demonstrator (IoD) Phase A/B1 will consolidate the OpSTAR IoD mission scope. It will notably refine the mission objectives as well as perform the System Preliminary Design Review (Step 1) of the overall OpSTAR IOD, preparing the foundations of the IOD Phase B2/C/D/E to…
-
Start date: 10/11/2024Duration: 24 MonthsThe proposed project seeks to develop a GNSS interference testbed for autonomous mobility including a methodology for testing and certifying GNSS interference with focus on jamming and spoofing threats. The current project will encompass the development of GNSS interference test scenarios, test and set-ups, testing executions, analysis of test results. The outcome of the project will be a…
Prime contractor
-
Start date: 21/10/2024Duration: 18 MonthsReliable and uninterrupted access to satellite navigation data is nowadays a key element for various branches of economy, security and safety. At the same time, GNSS systems are not 100% reliable and the issue of interference (both unintentional and intentional) affecting their operation is becoming more and more significant – especially in current geo-political situation. That is why a constant…
Subcontractors
Name: Head Office of Geodesy and Cartography
Country: Poland
Website: https://www.gov.pl/web/gugik-en
-
Start date: 21/10/2024Duration: 10 MonthsFollowing publication of the UK's first PNT Policy Framework to ensure resilience in its PNT infrastructure, NLAI will provide strategic support to the UKSA and the National PNT Office by updating key policy input sources to the SOTA (State-Of-The-Art) assessment, used to support business cases, decisions, planning, and preparedness actions. SPARK will undertake a review of the current PNT…
-
Start date: 16/07/2024Duration: 18 MonthsDevelopment of a broadband RDF receiver and antenna system for noise and interference mapping covering the HF to UHF bands so including GNSS bands. Each receiver will include edge computing for signature analysis and compression and will be networked to a central location for heat mapping of the noise and interference sources taking inputs form large numbers of receivers. The engineering is…
Subcontractors
-
Start date: 10/06/2024Duration: 6 MonthsThe UPDATE project will serve to define requirements, architecture and a development plan for a Minimum Viable Product (MVP) of a UK National PNT Digital Twin Environment (DTE). The MVP will meet the immediate needs of the UK Government with respect to delivery of its Policy Framework for Greater PNT Resilience (10-point plan). It will provide data in support of the development of business cases…
-
Start date: 06/03/2024Duration: 36 MonthsThe I-MASTER project aims to design and develop on a fresh water volcanic lake a National Test Range to test and validate by using self-propelled unmanned large sized surface ship models devices, subsystems, apparatuses, and procedures (data fusion, AI, rules and regulations) for MASS operations.
Prime contractor
Name: CNR-INM (Italian National Research Council - Institute for Marine Engineering)
Country: Italy
Website: http://www.inm.cnr.it/
Subcontractors