Start date: 01/10/2024Duration: 36 MonthsDue to the proliferation of jamming sources, localizing the source of RFI is becoming a priority. For GNSS users, especially the ones concerned with safety applications and critical infrastructures, but not limited to, it is imperative to be situationally aware of local GNSS interference. The GINKO-S Phase 2 product encompasses the minimum system configuration necessary to verify the…
Subcontractors
Name: Inter-university Consortium of Applied Physical Sciences (CISFA)
Country: Italy
Website: http://cisfa.net/
-
The activity aims at developing a new GNSS spaceborne receiver (called MARCONI New Space) to respond to several space market needs: • A Low-Cost GNSS Receiver suitable for large production (Constellations) - use, as much as possible, of selected COTS or low grade components with good radiation robustness and specific protection mechanism; • Compact design, internally redundant; • High…
Prime contractor
Name: Thales Alenia Space Italia S.p.A.
Country: Italy
Website: https://www.thalesaleniaspace.com/en
-
Start date: 17/09/2024Duration: 18 MonthsThe VAIPOSA project aims to develop innovative methodologies for designing and implementing Positioning, Navigation, and Timing (PNT) components using AI and machine learning (ML), while ensuring safety, robustness, and resilience. It employs a realistic road environment simulator where an autonomous agent with an AI-based PNT system must adapt to changing conditions. The project enhances…
Subcontractors
-
The GNSS-R Technology for Water Leaks Detection project aims to engineer an instrument, which can be installed in any vehicle, capable of pre-localizing water losses using the technique of scatterometry. This technique involves driving a vehicle over the water pipe, identifying the sections with different moisture content than the average measurements. In this way, operators can avoid the…
-
Start date: 30/06/2024Duration: 12 MonthsUnmanned Aerial systems (UAS) industry has undergone significant growth, propelled by advancements in miniaturization, cost-effectiveness and sensor fusion frameworks. However, this market is still lacking trustworthiness as enabler for safety-sensitive operations. To achieve scaled adoption, user acceptance, and compliance to regulatory and standardization ecosystem are key…
Prime contractor
Subcontractors
-
GSAB2 – Grimaldi Satellite Assisted Berthing 2 is a premiere and flagship project, awarded by ESA – NAVISP 2 program to an international consortium led by Grimaldi in partnership with Kongsberg (Norway), Radiolabs (Italy) and Rina Services S.p.A. (Italy) targeting the assisted berthing operations with big vessels as the PCTC – Pure Car & Truck Carriers. GSAB2, which is the evolution of the…
Prime contractor
Subcontractors
-
GLF solution is a GNSS technology downstream application (PNT User Segment) for precise positioning of football players during a match, representing an effective and innovative value-added tool for real time football performance monitoring. Without the installation of infrastructures in the stadium, the GLF device will allow calculation of “live” metrics to be used by the football team…
Subcontractors
-
The objective of the project is to focus on and implement existing time transfer data protocols (NTP, NTS...) and the feasibility of their integration in existing constellations. The scope is to study the overlay of data time transfer protocols (“Data TT”) onto satellite communication protocols. However, the perspective to study 5G NTN frames (“5G TT”) is not left out. The proposed…
Prime contractor
Subcontractors
-
Start date: 08/03/2024Duration: 24 MonthsSENTINEL is an innovative project that aims to develop a comprehensive solution for monitoring the use of earth moving machines and addressing the crucial challenges of theft prevention and ensuring correct machine usage. The earthmoving machines market, a significant sector in the construction and mining industry, has witnessed a growing trend towards equipment rental and leasing, both in Europe…
Subcontractors
-
Start date: 06/03/2024Duration: 12 MonthsThe I-MASTER project aims to design and develop on a fresh water volcanic lake a National Test Range to test and validate by using self-propelled unmanned large sized surface ship models devices, subsystems, apparatuses, and procedures (data fusion, AI, rules and regulations) for MASS operations.
Prime contractor
Name: CNR-INM (Italian National Research Council - Institute for Marine Engineering)
Country: Italy
Website: http://www.inm.cnr.it/
Subcontractors