-
Start date: 08/03/2024Duration: 24 MonthsSENTINEL is an innovative project that aims to develop a comprehensive solution for monitoring the use of earth moving machines and addressing the crucial challenges of theft prevention and ensuring correct machine usage. The earthmoving machines market, a significant sector in the construction and mining industry, has witnessed a growing trend towards equipment rental and leasing, both in Europe…
Subcontractors
-
Start date: 06/03/2024Duration: 36 MonthsThe I-MASTER project aims to design and develop on a fresh water volcanic lake a National Test Range to test and validate by using self-propelled unmanned large sized surface ship models devices, subsystems, apparatuses, and procedures (data fusion, AI, rules and regulations) for MASS operations.
Prime contractor
Name: CNR-INM (Italian National Research Council - Institute for Marine Engineering)
Country: Italy
Website: http://www.inm.cnr.it/
Subcontractors
-
Start date: 23/02/2024Duration: 24 MonthsThe scope of the work is to implement a multichannel disciplined oscillator which will optimally combine a set of independent information (GNSS, ADS-B, PTP/NTP) in order to provide Time and Frequency with the highest level of protection against GNSS attacks. In fact, the proposed system will implement a set of countermeasures able to detect and to resist to spoofing, meaconing and even jamming…
Subcontractors
-
Start date: 06/02/2024Duration: 24 MonthsThe NUMEROSO activity aims to assess the benefits of integrating Signals of Opportunity (SOOPs) with GNSS signals for navigation purposes, considering both terrestrial (such as 5G mobile or WiFi) and space-based (such as those transmitted by LEO satellites, or non-terrestrial networks) SOOPs. Leveraging advanced machine learning (ML) techniques, NUMEROSO will make use of SOOPs to enhance…
Subcontractors
-
Start date: 30/11/2023Duration: 18 MonthsThe principal aim of this project is to explore the applicability of today optics and photonic technologies to GNSS receivers. It is not always straightforward to understand which part of an electronic system may be conveniently replaced by its “photonic” counterpart, with clear advantages in terms of performance, integration density, power consumption, weight, EM immunity and…
Subcontractors
Name: TeCIP Institute of Sant’Anna School of Advanced Studies
Country: Italy
Website: https://www.santannapisa.it/en
Name: Thales Alenia Space Italy
Country: Italy
Website: https://www.thalesgroup.com/en/global/activities/space
-
Start date: 25/05/2023Duration: 30 MonthsThe Voliera (overall) project has been conceived to develop a stand-alone localization platform independent from the current on-board subsystem with the aim to minimize the wayside components linked to the localization. Voliera project foresees different phases by following an engineering development. In the phase 2 there are 2 main goals: -develop the tools needed to verify the properties…
Subcontractors
-
The PNT Moon surface Beacon and Reference Station (referred to as Moon Station) is an important component of the future LCNS system. The LCNS system will initially foresee the deployment of dedicated lunar orbiting ranging satellites, whereas the Moon Stations, as part of the LCNS surface infrastructure, will be deployed at a subsequent stage. Nonetheless, it is deemed important to implement…
Subcontractors
-
Start date: 10/11/2022Duration: 18 MonthsThe objective of LOCFIT (LOCalisation For Iot and Tracking) project is to develop innovative and robust infrastructure-based position-bounding solutions that exploit satellite uplink measurements of connected devices. Targeted users are low energy and low cost devices, with long life duration without maintenance, dedicated to : Land transportation: tracking of critical…
Prime contractor
Subcontractors
-
Development of Marconi GNSS Receiver for multi purposes application The proposed activity aim to the development of medium-low cost compact standalone GNSS receiver, with high reliability and performance, to be used both in institutional as well as commercial spaceborne applications, in full accordance with the emerging market needs like Leo Constellation, Moon, Launcher, MEO and GEO…
Prime contractor
Name: Thales Alenia Space Italia S.p.A.
Country: Italy
Website: https://www.thalesaleniaspace.com/en
-
The main objective of JNRS project is the development of a high-performance SDR device specifically tailored for GNSS applications (e.g., simulation of GNSS signals, SDR-based GNSS receiver, monitoring, spectrum surveillance, etc.), and targeting specific technical and cost requirements that should foster its market viability. This device is essentially made up of 2 main boards: - JNRS-SRD,…